DiscussionsPoser une question
0 Réponse(s)
Notes
Motors need to be wired to allow 240v 3 phase operation , Change from Star to Direct on Line/Delta
We only need to fit 1 Clutch spring plate - Not all 3 springs on the Crank
0 Réponse(s)
Also Done to F031 - Who use ZEB FDS label
Width set to 832
Left margin offset -30 (3mm)
0 Réponse(s)
On the original FDS Zeb files the label format is for 102mm Width to get the new printers to work you need set width at 832 (102mm) and in Advanced settings set left Position at -30 (-3mm) which will allow the label to work on a 99mm width
0 Réponse(s)
Z071 -- also needs the -30 (3mm) left position offset - Uses FDS Zeb files originally set to 101mm
0 Réponse(s)
Use an Orbital sander to do this job, Video shows it being done by Hand
0 Réponse(s)
Z108 - Has been updated
0 Réponse(s)
1 Réponse(s)
Z055 - ZX4 has been fitted using existing Software setup so Ou_InvDP not used (24v linked to S3 and S4.X308 - Inverter Zero fitted but not used. Uses Drive Run Fwd not using SMOT.
0 Réponse(s)
STO alarm
Please see https://stuga.dokit.app/wiki/Yaskawa_Inverter_-_Fault_and_Alarm_Output_Functionality
Once wiring changes have been made, change parameter H2-03 to 110. This can be done online via DriveWizard or directly through the
inverter touchpad.
Pages dans la catégorie « Maintenance »
Cette catégorie comprend 8 pages, dont les 8 ci-dessous.
(page précédente) (page suivante)(page précédente) (page suivante)
Français
English
Deutsch
Español
Italiano
Português