Fitting details for completed assemblies
Auteur Gareth Green | Dernière modification 22/11/2023 par Gareth Green en cours de rédaction ⧼frevu-button-review-label⧽
Fitting details for completed assemblies
R0015259_Mount_roller_beds_to_mainframe_Screenshot_2023-07-04_094602.png
Tools Required
Standard Hex key Set
Standard spanner set
Parts Required
Completed Assemblies
R0015081
All bolts to have Loctite 243 adhesive applied unless otherwise stated
All Threaded Pneumatic connections to have Loctite 570 applied
All bolts to be pen marked once adhesive applied and correct tension added
Build sequence has been modified for improved access to key stages of build
Drive shafts will now be fitted before roller beds , this being enabled by a change to the bench assembly process of the roller beds .
Please take photos of these steps for update
1 Position Bracket on blue section , holding roller frame upright
2 Fix bracket with M8 x 25 socket caps and heavy M8 washers
3 Lower roller frame to 90 degrees
4 Wind cylinder thread into attached rod end bearing
1 Mount assemblies as shown using M8 x 25 socket caps and heavy M8 washers.
Do not apply Loctite 243 at this stage to bolts
Only apply enough tension to fasteners to hold roller assemblies true to the mounting face (Blue section)
2 Attach R0015081 using the same fasteners as above. Ensure the slots are used to align to the other roller bed assemblies as shown
en none 0 Draft
Vous avez entré un nom de page invalide, avec un ou plusieurs caractères suivants :
< > @ ~ : * € £ ` + = / \ | [ ] { } ; ? #