Details for mounting cylinder rails to transfer beams
Auteur Gareth Green | Dernière modification 3/04/2024 par Gareth Green en cours de rédaction ⧼frevu-button-review-label⧽
Details for mounting cylinder rails to transfer beams
R0015292_Install_Cylinder_Rails_and_Align_Screenshot_2023-10-30_081130.png
Tools Required
Standard spanner set
Standard hex key set
Parts Required
R0015288 Bench Assemble Transfer slid units and cylinder rails
Use Loctite 243 on all fasteners
Use Loctite 572 on all threaded pneumatic connection
Pen mark all fasteners to show finalised
Adjust delrin wheels on section shown
Ensure to use Setting Delrin Transfer Table Wheel Tension To set delrin wheels correctly
Adjust delrin wheels on section shown
Ensure to use Setting Delrin Transfer Table Wheel Tension To set delrin wheels correctly
Check all fasteners are correctly tensioned
Ensure all delrin wheels are correctly set and all fasteners on delrin wheels are tensioned to final tension
Set cylinder rails to hepco rail
Set all cylinder rails to same measurement to hepco beam
Use slots in rack mounting and drive gear position to adjust
Mesh requires setting between slider unit and drive pinion
1 It is vital that the correct drive meshing is achieved.
2 Once set, there should be 1mm movement in the direction shown, which will indicate the correct tooth meshing has been obtained.