R0015293 Install Flap Sensor Beam

Auteur avatarGareth Green | Dernière modification 29/01/2024 par Gareth Green en cours de rédaction

Correct installation , setting and quality checks for installation of material sensor beam

Introduction

Tools Required


Standard hex key set

2 Meter straight edge


Parts Required


R0015060 Bench Assemble Flapper Beam

M0001016 Angle 74 x 38 x 2

Étape 1 - Unless otherwise stated

Use Loctite 243 on all fasteners

Use Loctite 572 on all threaded pneumatic connection

Pen mark all fasteners to show finalised



Étape 2 - Attach mounting brackets to module C and E

Attach mounting brackets as shown


Étape 3 - Position and fix Assembled beam

(front transfer beam removed for clarity )


Fix assembled beam to supports as shown


Do not finalise fasteners



Étape 4 - Set height of assembled beam

Use sliding adjustment on maytec angles /frame to adjust height of assembly


To determine correct height Set end A and B separately



Étape 5 - Setting Height

Span over transfer beams 1 and 2 with straight edge at point A


Lift or lower sensor rail assembly to match the following criteria

Commentaires

Draft