Correct settings and installation procedure for transfer beam assemblies
Auteur Gareth Green | Dernière modification 3/04/2024 par Gareth Green en cours de rédaction ⧼frevu-button-review-label⧽
Correct settings and installation procedure for transfer beam assemblies
R0015291_Install_Transfer_Beams_To_Module_C_and_E_Screenshot_2023-10-30_141132.png
Tools Required
Standard hex key set
Module pitching jigs
Tape measure 7.5 meter
Engineers level
1 meter spirit level
Parts required
Use Loctite 243 on all fasteners
Use Loctite 572 on all threaded pneumatic connection
Pen mark all fasteners to show finalised
Module E will require accurately positioning to align with Module C
Only frame E must be moved
Move module E in the directions shown to align to jigs
Fasten jigs to module E once aligned
Module E will require re levelling now it has been moved
Level from carriage plate for X axis and support arms for Y axis
Using loading arms as datum , lift or lower Module E on adjusting bolts to bring module level with module C
Fit transfer beam 1 (with pneumatic rail ) and transfer beam 9 (no pneumatic rail ) to modules
Fasten with button heads
Check that transfer beams sit flat along indicated faces
Check that beams are Parallel by measuring with a tape measure
Report any discrepancy to supervisor
Adjust Squareness by moving Module E in the direction shown
Frame will need to move half the distance of the discrepancy measured on corner measurements
Once adjustment is complete, check measurements and levels of all areas adjusted
Once all transfer beams are installed, check flatness with a 2 meter straight edge
Span across arms with 2 meter straight edge and check that no arms are sitting higher or lower than other transfer arms
Report any discrepancy to supervisor
en none 0 Draft
Vous avez entré un nom de page invalide, avec un ou plusieurs caractères suivants :
< > @ ~ : * € £ ` + = / \ | [ ] { } ; ? #