Introduction

Tools Required


Standard hex key set

Standard spanner set

Wire Line setting equipment

600mm rule

Workshop Gripper setting jig

2 meter straight edge


Parts Required


Fitted and Levelled roller bed assemblies

Étape 1 - Unless otherwise stated

Use Loctite 243 on all fasteners

Use Loctite 572 on all threaded pneumatic connection

Pen mark all fasteners to show finalised



Étape 2 - Set position 1

Set backfence position 1 to have a gap of 3mm at the indicated point


Étape 3 - Measure Position 1

Take measurement at indicated point



Étape 4 - Set position 10

Set position 10 to measure taken in previous step from position 1


Étape 5 - Add wire line to backfences

Fit wire line to backfences to span all



Étape 6 - Ensure only positions 1 and 10 are contacting

Ensure all positions of backfences except 1 and 10 are not touching wire line



Étape 7 - Adjust each backfence

Individually adjust each backfence to be less than 1mm from wireline but not touching



Étape 8 - Finalise alignment

The first 2 meter section of backfences from position 1 should now be fine tuned with a 2 meter straight edge


Position 2 meter straight edge against indicated points



Étape 9 - Quality /alignment check

Use steel rule to measure each backfence position from hepco rail


Measurement taken in step 3 should indicated at all backfences if set correctly .



Étape 10 - Gripper position setting

Gripper position requires setting now that back fences are aligned


The following steps should be followed for correct alignment



Étape 11 - Use setting jig

Ensure setting jig is set against position 1 backfences


Ensure setting jig is orientated correctly , correct offset of holes towards backfence