R0015084 Bench assemble and Drill Off Swarf chutes

Auteur avatarGareth Green | Dernière modification 3/04/2024 par Gareth Green en cours de rédaction

Introduction

Tools Required


Standard hex key set

Standard HSS drill set

Standard tap set

Standard spanner set


Parts Required

Étape 1 - Unless otherwise stated

Use Loctite 243 on all fasteners

Use Loctite 572 on all threaded pneumatic connection

Pen mark all fasteners to show finalised



Étape 2 - ECR raised

Ecr raised to cover current reworks to panel


Until processed rework at production

Étape 3 - Assemble chutes

Assemble chute panels as shown



Étape 4 - Position swarf corners

Position swarf corners onto main frame



Étape 5 - Position assembled chute

Position assembled chute into frame



Étape 6 - Adjust chutes and corners

Adjust panels to best fit



Étape 7 - Drill off to suit

Drill to suit all fixing holes @ M5


8 off in total



Étape 8 - Mark lower chute position

With chutes still fitted, align and mark lower lip cute


Align with bottom of lifting channel and central between fitted chutes


Étape 9 - Remove all chutes

Remove all chutes and drill marked fixing points for lower lip chute


Drill 2 off M5



Étape 10 - Assemble chutes

Fit blowers to chutes and add connecting 8mm black pipe. Fix with M4 tie base and tiewrap


Add 2 off 6mm bulkheads and tie base for clamp feeds


Add grommit for clamp reed switch



Étape 11 - Label bulkheads both sides of panel

Label 6mm bulkheads both sides of panel as


3501 and 3502



Commentaires

Draft