Drilling and assembly details for swarf chutes
Auteur Gareth Green | Dernière modification 3/04/2024 par Gareth Green en cours de rédaction ⧼frevu-button-review-label⧽
Drilling and assembly details for swarf chutes
R0015084_Bench_assemble_and_Drill_Off_Swarf_chutes_Screenshot_2023-10-25_080909.png
Tools Required
Standard hex key set
Standard HSS drill set
Standard tap set
Standard spanner set
Use Loctite 243 on all fasteners
Use Loctite 572 on all threaded pneumatic connection
Pen mark all fasteners to show finalised
Ecr raised to cover current reworks to panel
Until processed rework at production
With chutes still fitted, align and mark lower lip cute
Align with bottom of lifting channel and central between fitted chutes
Remove all chutes and drill marked fixing points for lower lip chute
Drill 2 off M5
Fit blowers to chutes and add connecting 8mm black pipe. Fix with M4 tie base and tiewrap
Add 2 off 6mm bulkheads and tie base for clamp feeds
Add grommit for clamp reed switch
Label 6mm bulkheads both sides of panel as
3501 and 3502
en none 0 Draft
Vous avez entré un nom de page invalide, avec un ou plusieurs caractères suivants :
< > @ ~ : * € £ ` + = / \ | [ ] { } ; ? #