R0015337 Bench Assemble Guarding Components

Auteur avatarGareth Green | Dernière modification 26/06/2024 par Gareth Green en cours de rédaction

Introduction

Tools Required


Standard hex key set

Standard spanner set

Standard HSS drill set

Acoustic mat cutting board and straight edge

Utility blade


Parts Required


D0000770 Door Hinge (M0016) x 2

D0001886 Front Door Saw Mk 4 x 1

M0000002 12mm Grey Acoustic Foam with Black PVC Facing x 1

M0000539 Handle Black Nylon 200mm M8 Fixings x 1

M0000031 panel edging ( consumable stock )

M0000150 Stuga sticker clear x 1

M0000154 Stuga service sticker x 1



Étape 1 - Unless otherwise stated

All bolts to have Loctite 243 adhesive applied unless otherwise stated

All Threaded Pneumatic connections to have Loctite 570 applied

All bolts to be pen marked once adhesive applied and correct tension added



Étape 2 - Cut Acoustic foam

Measure and cut acoustic foam to internal area of front door using cutting board and straight edge


Cut Acoustic foam to clear switch mounting block



Étape 3 - Fit acoustic foam

Peel back small area of acoustic foam backing


Position and neatly align within door aperture


Remove all adhesive backing and finalise acoustic foam



Étape 4 - Door Handle mounting

Drill through pre drilled holes in door to create clearance holes for mounting of door handle


Fix with M8 capheads only



Étape 5 - Fit door hinges

Fit 2 off door hinges using M4 x 12 button hex , A form washers, Shakeproof washers and standard nuts



Étape 6 - Fit panel edging

Fit panel edging to all edges that are not covered by hinges or switch mounting block



Étape 7 - Fit stickers to front

Fit stuga sticker large and Stuga service sticker to front of door


Provide measurements



Commentaires

Draft