Assembly details for X axis energy chain
Auteur Gareth Green | Dernière modification 3/04/2024 par Gareth Green en cours de rédaction ⧼frevu-button-review-label⧽
Assembly details for X axis energy chain
R0015251B_Bench_Assemble_X_Axis_Energy_chain_Screenshot_2023-08-18_092205.png
Tools Required
Small flat screwdriver
Identification markers
Parts Required
A0001112 Energy Chain Separator: 2500 Chain x 24
A0001113 Energy Chain: Series 2500.03 55mm Bend Radius x 4.2 meter
A0001114 Energy Chain Bracket Set: 24/2500 Plastic, Pivoting x 1
E0000439 Connector Brad Harrison M8 3 pole 10 m lead pvc x 3
E0001237 Pre Made Cable :Beckoff Extension AM8032 9.0m x 1
Total links of for A0001113 Energy Chain is 113
Double check correct quantity, But do not assemble links yet
1 Assemble 111 links together , ensure all links are orientated the same way .
2 Identify the female end of the assembled links
3 Fit 2 more links of A0001113, but fit in a reversed orientation
Attach mounting brackets A0001114
1 Attach male bracket to reversed links and orientated as shown
2 Attach female bracket to opposite end orientated as shown
3 Energy ends will now be itemised as A and B as shown
1 Open all links of trunking using a small flat screwdriver to release
Picture required please :)
2 Fit A0001112 Energy Chain Separators to the following positions
Start From reversed link end A , fit 2 separators to first reversed link
3 Counting from the first separators fitted, fit additional 2 off separators to every tenth link
4 This is correct
Add identification markers to 3 off E0000439 cables
X44
X283
X10
Fit cables to energy chain in section 1 as shown. Plugs should exit energy chain at the male bracket / reversed link end . Leave 1 meter of cable to exit from plug end
Use Cable E0001237 Pre Made Cable :Beckoff Extension AM8032 9.0m x 1 and identify as 'XA'
Fit to section 2 and leave Female plug and 0.5meter of cable to exit energy chain at end A
Cut 3 0ff lengths of 6mm x 4mm black air pipe at 9 meters
Add identification as follows
1229
1211
1219
Fit to section 3 and leave 1 meter of pipe exiting the energy chain at end A