[version en cours de rédaction] | [version en cours de rédaction] |
Ligne 282 : | Ligne 282 : | ||
{{Notes}} | {{Notes}} | ||
{{PageLang | {{PageLang | ||
− | |||
|SourceLanguage=none | |SourceLanguage=none | ||
|IsTranslation=0 | |IsTranslation=0 | ||
+ | |Language=en | ||
}} | }} | ||
{{Tuto Status | {{Tuto Status | ||
|Complete=Draft | |Complete=Draft | ||
}} | }} |
Instructions to assemble loader wheel
Auteur Gareth Green | Dernière modification 22/11/2023 par Gareth Green en cours de rédaction ⧼frevu-button-review-label⧽
Instructions to assemble loader wheel
R0015030B_Bench_assemble_loader_wheel_Screenshot_154.png
Tools Required
Standard hex keys
Standard spanner set
Cutting blade
Rule
External circlip pliers
Switch setting box
Ball pien hammer
Parts Required
D0015438 x 1
D0010431 x1
B0000426 x 1
B0000173 x 7
D0010238 x 1
B0000046 x 2
D0015741 x 1
D0015439 x 1
M0001077 x 1
D0010509 x 1
D0015436 x 1
D0010611 x 1
P0001044 x 1
P0001098 x 1
P000001174 x 1
P0000200 x 1
P0001198 x 1
P0001047 x 1
P0001041 x 1
P0001042 x 1
B0000240 x 1
B0001100 x 2
D0015435 x 1
B0000053 x 1.2
B0000054 x 2
D0015434 x 1
B0000189 x 1
B0000142 x 1Use loctite 243 on all fasteners
Use Loctite 572 on all threaded pneumatic connections
Pen mark all bolts to show finalised
1 Attach D0015438 to D0010431 Using M8 x 20 socket caps
2 Attach linear rail B0000426 using 2 off m6 x 20 socket caps and 5 off M6 x 30 socket caps. Make sure linear rail is pushed hard against one register side of machined slot.
3 Attach D0015741 support web using 5 off M6 nyloc nuts and M6 A form washers and 2 off M6 x 16 socket caps with A form washers
4 Insert rail caps 7 off B0000173 ensuring they sit flush to rail face
Attach cylinder mount block D0010238 to assembly with 4 off M6 x 20 socket caps
1 Attach damper block D0015439 to main plate in position shown using 2 off M8 x 50 socket caps
2 Attach M0001077 damper to block
1 Slide B0000046 bearings onto linear rail and ensure datum face of both bearings is facing the same way as the datum arrow on the linear rail. Release m3 button heads (4 off per bearing) the allow seals to centralise to the rail. Retension m3 buttons and then remove bearings from rail.
2 Use Fe 10 solvent cleaner to degrease M6 holes in bearings for correct adhesive function, and then clean with compressed air .
3 fit grease nipples in the orientation shown and then refit bearings to linear rail
Use grease gun to grease 2 off B0000046 bearings
Use 8 off M6 x 12 socket caps to mount D0010509 slide block to bearings , ensuring datum face of bearing pushes up against register on slide block
1 Insert 2 off 6mm x 20mm dowels into motor plate
2 Use 6 off M8 x 30 socket cap and fix D0015436 in position
1 Use 4 off M5 x 12 socket caps and A Form washers to mount cylinder P0001044 to bracket D0010611
2 Use 4 off M5 x 16 socket caps and A Form washers to mount cylinder bracket to assembly. Leave these bolts loose until next steps are complete
3 Attach cylinder piston. Set to position shown and finalise m10 locking nut
4 Contract assembly to closed position and finalise M5 x 16 socket caps holding top of cylinder. This will centralise cylinder into correct position for alignment .
5 Check cylinder stroke is smooth and consistent
1 Combine P0000200, P0001098 and P0001174 as shown and fit to cylinder
2 Fit P0001198 to other port of cylinder
3 Attach P0001041 and P0001042 reed switch mounting set to cylinder as shown. Attach P0001047 reed switch and identify as X304 . Set the reed switch in the home position which is the cylinder fully contracted
1 Check load motor B0000240 is assembled correctly. Terminal connection box needs to face the direction shown. If not, disconnect gearbox and rotate to achieve correct orientation
2 Insert 2 off keys B0001100 into D0015435
3 Fit shaft into gearbox bore and captivate with 23mm external circlip
1 Attach motor as shown using M8 x 30 socket caps, a Form washers and M8 nyloc nuts
2 It may be necessary to disconnect cylinder to allow access to final fastener . Ensure cylinder is reconnected correctly as per previous steps if a removal is required .
1 Cut 2 pieces of B0000053 red thane belting at 475mm and join each one together with a B0000054 connector. Mount onto D0015434 pulley.
2 Assemble pulley onto B0000189 torque converter as shown
3 view to show correct configuration of B0000189 torque converter
1 Fit B0000142 key to shaft
2 Slide on loader wheel assembly . Fix with 15mm external circlip.
Grubscrew point in torque converter is not used
en none 0 Draft
Vous avez entré un nom de page invalide, avec un ou plusieurs caractères suivants :
< > @ ~ : * € £ ` + = / \ | [ ] { } ; ? #