P0001108 12mm Tee connector  x 2  
 
P0001108 12mm Tee connector  x 2  
  
R0015071 Pneumatics  rail</translate>
+
R0015071 Pneumatics  rail
 +
 
 +
A0000343 energy chain x 1
 +
 
 +
A0000344 energy chain bracket set x 1
 +
 
 +
D0015577 fixed energy chain bracket x 1</translate>
 
}}
 
}}
 
{{Materials}}
 
{{Materials}}

Version du 16 août 2023 à 14:32

Auteur avatarGareth Green | Dernière modification 11/03/2024 par Gareth Green en cours de rédaction

Introduction

Tools Required


Pipe cutters

Number identification

Flush cutters


Parts Required

P0000160 Flow regulator 6mm inline x 2P0000551 6mm inline Quick Exhaust Fitting x 3

P0001008 Regulator: ARG20 0 - 8.5 Bar c/w Gauge x 1

P0001023 Fitting: SMC 6mm mini Y x 4

P0001030 Fitting: SMC 6mm Equal Tee x 27

P0001108 12mm Tee connector x 2

R0015071 Pneumatics rail

A0000343 energy chain x 1

A0000344 energy chain bracket set x 1

D0015577 fixed energy chain bracket x 1

Étape 1 - Mount Pneumatic rail

Mount pre assembled pneumatic rail R0015071 into the position shown . Fix with M6 fasteners (size of fasteners and height of rail on frame required)


Étape 2 - Install Y244 material load sensor blowers

6mm Black air pipe

Identify all pipes as 2449


  • Connect 2 off pipes to fitted P0000200 elbows (1) and add P0001023 mini y connector to pipes to convert to single feed pipe
  • attach long enough pipe to reach wire basket directly behind (2) . Ensure slack is left to allow for roller movement up
  • Add P0000160 Flow regulator
  • Add pipe to flow regulator fitting to reach main valve bank
  • Attach to indicated sections (3) of wire basket
  • Connect to (4 -active) port of valve slice


Étape 3 - Install Y125 Pop up C pipework

6mm black air pipe


Pipe identified as 1259


9 off pop up C cylinders to be connected (1)


Ensure enough slack is left on pipe between basket and cylinder to allow full range of movement


  • (1) 6mm tee feeds cylinder above and to the left
  • (2) 6mm tee feeds cylinder above and ring main left and right
  • (3) 6mm tee feeds cylinder above and ring main left and right
  • (4) 6mm tee feeds cylinder above and ring main left and right
  • (5) 6mm tee feeds valve below and ring main left and right
  • (6) 6mm tee feeds cylinder above and ring main left and right
  • (7) 6mm tee feeds cylinder above and ring main left and right
  • (8) 6mm tee feeds cylinder above and cylinder to the right

Étape 4 - Install Y124 Roller beds

6mm black air pipe


Pipes identified as 1249 and 1241


Cylinder nose 1249

Cylinder base 1241


(1) (2) (3) (4) connect all as shown using 6mm tee fittings position (1) feeds roller to the left as well as one above

(4) Feeds ring main to valve

(5) Feeds cylinder above and ring main to the right

(6) Feeds cylinder above and ring main to the right

(7) Feeds cylinder above and cylinder to the right

Étape 5 - Y126 / Y127 beam position

pipe identifications


1269 and 1279


Fitting on cylinder closest to extractor should be 1279


Other fitting will be 1269


Connect with 10mm black airpipe to standalone valve


Electrical connection will match port connections of two pipes

Étape 6 - Y232 Y233 and Y234

Identification as

2329 2339 2349

Home port (2) should be blanked at valve bank


Run from active port on valve bank (port 4) to transfer beam number 4 .

Fit A000343 energy chain @44? links

A0000344 energy chain brackets as shown

Mount to D0015577 fixed bracket and attach to support arm as shown

Must have a P0000551 qev fitted to each line

Étape 7 - Y121 Gripper height

Gripper height is lifted for home position

identification

1211 Home port of valve bank (2) to nose of cylinder

1212 base of cylinder to out port on regulator

1219 In port of regulator to active port on valve bank (4)

Étape 8 -

Identification 1229

Must have flow regulation P0000160

Connect to active port (4) on valve bank



Étape 9 - Connect ring main

Connect 12mm blue airpipe from valve banks to end of frame for machine connections

Commentaires

Draft