[version en cours de rédaction] | [version en cours de rédaction] |
Ligne 53 : | Ligne 53 : | ||
{{Materials}} | {{Materials}} | ||
{{EPI}} | {{EPI}} | ||
+ | {{Tuto Step | ||
+ | |Step_Title=<translate>Unless otherwise stated</translate> | ||
+ | |Step_Content=<translate>Use loctite 243 on all fasteners | ||
+ | |||
+ | Use Loctite 572 on all threaded pneumatic connections | ||
+ | |||
+ | Pen mark all fasteners to show finalised</translate> | ||
+ | |Step_Picture_00=R0015086_Assemble_Pneumatics_on_to_electrical_cabinet_loctite_243.png | ||
+ | }} | ||
{{Tuto Step | {{Tuto Step | ||
|Step_Title=<translate>Mount pre built R0015007 Bench Assemble Roller Tables</translate> | |Step_Title=<translate>Mount pre built R0015007 Bench Assemble Roller Tables</translate> |
Instructions to mount pre built assemblies to main frame
Auteur Gareth Green | Dernière modification 26/06/2024 par Gareth Green en cours de rédaction ⧼frevu-button-review-label⧽
Instructions to mount pre built assemblies to main frame
R0015255_Mount_Assemblies_to_Main_Frame_Screenshot_2023-07-13_093726.png
Tools Required
Standard Hex key set
Standard spanner set
300 mm rule
1000mm rule
Parts Required
D0015291 Datum Flag x 1
D0015717 Energy Chain Angle Bracket Lower x 5
D0015718 Energy Chain Angle Bracket Upper x 2
D0015718B Energy Chain Angle Bracket Double Deck x 3
D0015720 Carriage Bracket x 1
D0015721 Energy Chain Tray Deep Longx 3
D0015722 Energy Chain Tray Shallow Long x 1
D0015861 Energy Chain Cable Support x 1
D0015862 Energy Chain Tray Deep Long x 1
R0015007 Bench Assemble Roller Tables
R0015096 Bench Assemble Transfer Drive Assembly
R0015251 Bench Assemble X axis components and energy chain
R0015004 Bench Assemble GripperUse loctite 243 on all fasteners
Use Loctite 572 on all threaded pneumatic connections
Pen mark all fasteners to show finalised
Mount roller beds as indicated , using M8 x 30 socket caps and heavy M8 washers.
Do not apply adhesive to fasteners and only apply holding tension to fasteners
1 Mount Gripper assembly to carriage using 2 off M8 x 35 socket caps 2 off Mi8 x 25 socket caps and heavy M8 washers
2 Check and adjust parallel to ensure gripper is true to hepco beam both indicated measurements should be identical
1 Mount 5 off D0015717 Lower mounting angle with 2 off M10 x 25 set bolts and A form washers per bracket . Do not apply adhesive at this point
2 Set height to just clear plastic frame cap and set bracket level
1 Mount 2 off D0015718B to positions shown using M6 x 16 socket caps and heavy M6 washers .
2 Mount 1 off D0015718B to position indicated with M6 x 20 Socket capsand heavy M6 washers. Do Not apply adhesive yet to this brackets fasteners
3 Set slot position to be flush with lower bracket
1 Mount 1 off D0015718 to indicated point using M6 x 16 socket caps and heavy M6 washers . Set faces flush as with previous step
2 Position 1 off D0015718 at indicated point and use M6 x 20 socket caps and heavy washer to fix in position combining part D0015861 as shown
3 Use previous fitted fasteners to mount other end of D0015861 onto previous fitted bracket , and finalise bolts
Lightly fix these parts, as adjustment will be required later
1 Fit D0015721 at indicated position . Use M5 x 16 button hex bolt, M5 penny washer and M5 nyloc nut .
2 Fit D0015721 to indicate point with same fixings as above
3 Fit D0015722 to indicate point with same fixings as above
Use same method as step 6 to mount indicated upper chain guides 2 off
1 D0015862 upper chain guide
2 D0015721 upper chain guide
Fit D0015720 carriage bracket as shown using M6 x 16 socket caps and A form washers
Fit pre built energy chain from assembly R0015251 and attach using M5 x 16 button heads, medium washers and M5 nyloc nuts as shown
1 Move gripper with energy chain attached to point indicated
2 Adjust bracket in indicated direction so that energy chain sits central in the tray
3 Measure indicated distance S
4 Set the next 4 lower tray mounting points to replicate this measurement using the same method of adjustment with the angled bracket
Using the first point used to set the brackets , measure the gap indicated and replicate this measurement on the other 4 points . This is adjusted by moving the indicated bracket up or down .
1 Move large radius of energy chain to the indicated point
2 Adjust height of top tray so internal gap is 10mm bigger than the height of the bend of the energy chain
3 Measure indicated gap
4 Set 2 remaining points indicated to step 3 measurement
Move Gripper carriage along the complete length of the hepco beam , and monitor the energy chain .
Check that there is no sideways pressure on the chain from misalignment
Check that no snags occur on fixings when energy chain is travelling
Now aligned , ensure all fixings used to assemble the energy trays and brackets have adhesive apllied and final tension added to fasteners and pen marked
1 Mount D0015291 Datum Flag to hepco beam in position shown using M6 x 12 socket caps , A form washers and D nuts ( size type required )
2 Adjust Datum sensor at point indicated to be less than 1mm above datum flag face . Use thread and nuts on sensor to adjust height
3 Move gripper to indicated point and adjust datum flag up or down to replicate gap set on previous side
4 Move gripper back to previous point and check sensor gap is still acceptable
1 Position 2 off drive assemblies in the positions indicated
2 Use a 1000mm steel rule to align indicated sprocket with drive sprocket on drive shaft indicated
Repeat for both motor assemblies
1 Fit drive chain to shaft sprocket and motor assembly.
2 Adjust tensioner to apply tension to chain
Repeat for both motor assemblies