R0015295 Finalise wiring loom for Rotary head : Différence entre versions

[version en cours de rédaction][version en cours de rédaction]
Ligne 42 : Ligne 42 :
 
|Step_Title=<translate>Wiring loom positioning 300hz power</translate>
 
|Step_Title=<translate>Wiring loom positioning 300hz power</translate>
 
|Step_Content=<translate>1  Start at connection point with 3 power cables exiting . Set one cable as shown to 150mm</translate>
 
|Step_Content=<translate>1  Start at connection point with 3 power cables exiting . Set one cable as shown to 150mm</translate>
 +
|Step_Picture_00=Finalise_wiring_loom_for_Rotary_head_Screenshot_2023-05-31_154443.png
 +
|Step_Picture_00_annotation={"version":"2.4.6","objects":[{"type":"image","version":"2.4.6","originX":"left","originY":"top","left":0,"top":0,"width":734,"height":827,"fill":"rgb(0,0,0)","stroke":null,"strokeWidth":0,"strokeDashArray":null,"strokeLineCap":"butt","strokeDashOffset":0,"strokeLineJoin":"miter","strokeMiterLimit":4,"scaleX":0.82,"scaleY":0.82,"angle":0,"flipX":false,"flipY":false,"opacity":1,"shadow":null,"visible":true,"clipTo":null,"backgroundColor":"","fillRule":"nonzero","paintFirst":"fill","globalCompositeOperation":"source-over","transformMatrix":null,"skewX":0,"skewY":0,"crossOrigin":"","cropX":0,"cropY":0,"src":"https://stuga.dokit.app/images/f/fc/Finalise_wiring_loom_for_Rotary_head_Screenshot_2023-05-31_154443.png","filters":[]},{"type":"wfnumberedbullet","version":"2.4.6","originX":"left","originY":"top","left":289,"top":331,"width":25,"height":25,"fill":"rgb(0,0,0)","stroke":"#FF0000","strokeWidth":0,"strokeDashArray":null,"strokeLineCap":"butt","strokeDashOffset":0,"strokeLineJoin":"miter","strokeMiterLimit":4,"scaleX":1,"scaleY":1,"angle":0,"flipX":false,"flipY":false,"opacity":1,"shadow":null,"visible":true,"clipTo":null,"backgroundColor":"","fillRule":"nonzero","paintFirst":"fill","globalCompositeOperation":"source-over","transformMatrix":null,"skewX":0,"skewY":0,"objects":[{"type":"circle","version":"2.4.6","originX":"center","originY":"center","left":0,"top":0,"width":24,"height":24,"fill":"#FF0000","stroke":null,"strokeWidth":1,"strokeDashArray":null,"strokeLineCap":"butt","strokeDashOffset":0,"strokeLineJoin":"miter","strokeMiterLimit":4,"scaleX":1,"scaleY":1,"angle":0,"flipX":false,"flipY":false,"opacity":1,"shadow":null,"visible":true,"clipTo":null,"backgroundColor":"","fillRule":"nonzero","paintFirst":"fill","globalCompositeOperation":"source-over","transformMatrix":null,"skewX":0,"skewY":0,"radius":12,"startAngle":0,"endAngle":6.283185307179586},{"type":"text","version":"2.4.6","originX":"center","originY":"center","left":0,"top":0,"width":7.79,"height":15.82,"fill":"rgba(255,255,255,255)","stroke":null,"strokeWidth":1,"strokeDashArray":null,"strokeLineCap":"butt","strokeDashOffset":0,"strokeLineJoin":"miter","strokeMiterLimit":4,"scaleX":1,"scaleY":1,"angle":0,"flipX":false,"flipY":false,"opacity":1,"shadow":null,"visible":true,"clipTo":null,"backgroundColor":"","fillRule":"nonzero","paintFirst":"fill","globalCompositeOperation":"source-over","transformMatrix":null,"skewX":0,"skewY":0,"text":"1","fontSize":14,"fontWeight":"normal","fontFamily":"arial","fontStyle":"normal","lineHeight":1.16,"underline":false,"overline":false,"linethrough":false,"textAlign":"left","textBackgroundColor":"","charSpacing":0,"styles":{} }],"number":1}],"height":676,"width":600}
 
}}
 
}}
 
{{Notes}}
 
{{Notes}}

Version du 31 mai 2023 à 15:46

Auteur avatarGareth Green | Dernière modification 23/06/2023 par Gareth Green en cours de rédaction

Introduction

Tools required

Étape 1 - Wiring loom positioning Ethercat control

Cables must be adjusted between each spindle to ensure the cable lengths are correct .

1 Start at cable point between 6 and 5 . Start with the light green ethercat cable with the right angle plug. Adjust so that 200mm is past the end of the spindle plate . See picture for detail.

2 Move to the next spindle connection between 5 and 4 and adjust the new right angled ethercat cable to match the length of the previous adjusted cable

3 Repeat this process working your way around the spindles to set all ethercat cables

Étape 2 - Wiring loom positioning Ethercat power

1 Start at cable point between 6 and 5 . Adjust black power cable to 200mm from edge of plate. See picture for details

2 Move to the next spindle connection between 5 and 4 and adjust the new black power cable to match the length of the previous adjusted cable

3 Repeat this process working your way around the spindles to set all power cables

Étape 3 - Wiring loom positioning 300hz power

1 Start at connection point with 3 power cables exiting . Set one cable as shown to 150mm