Flowline Turret Upgrade - Somatec : Différence entre versions

[version en cours de rédaction][version en cours de rédaction]
Ligne 37 : Ligne 37 :
 
}}
 
}}
 
{{Tuto Step
 
{{Tuto Step
|Step_Title=<translate></translate>
+
|Step_Title=<translate>Test rotation and feedback from IO screen</translate>
|Step_Content=<translate></translate>
+
|Step_Content=<translate>The feedback should count up in binary for the position selected
 +
<br /><syntaxhighlight>
 +
Pos  IxA  IxB  IxC
 +
1    1    0    0
 +
2    0    1    0
 +
3    1    1    0
 +
4    0    0    1
 +
5    1    0    1
 +
6    1    1    1
 +
</syntaxhighlight><br /></translate>
 +
}}
 +
{{Tuto Step
 +
|Step_Title=<translate>Label the turret bolts and capstan positions</translate>
 +
|Step_Content=<translate>Using the IO screen, rotate to position 1.
 +
 
 +
# Using a pneumatic pipe marker, Label the "active" bolt with the number relating to the feedback position
 +
# Using a permanent marker, label the capstan where it is clearly visible
 +
 
 +
 
 +
Repeat for all 6 positions</translate>
 
}}
 
}}
 
{{Notes}}
 
{{Notes}}

Version du 29 septembre 2020 à 14:22

Auteur avatarGareth Green | Dernière modification 29/09/2020 par Gareth Green en cours de rédaction

Étape 1 - Remove existing turret and associated parts

Remove all parts from the existing turret, to leave just the mounting plate and the cylinder and fittings etc, as shown



Étape 2 - Fit Sometec mount

Fit the Somatec mount block (D0015715) with M8 bolts (you will need to remove the mounting plate from the hood to bolt in from behind.



Étape 3 - Fit Somatec turret

Fit Somatec turret with 3 off M6 bolts.




Étape 4 - Fit the new strike plate

Fit new strike plate. It has the same mounting points etc as existing one, so all fittings can be reused



Étape 5 - Fit new bolts into rotating head of turret

Install bolts into the turret head, according to required length. Ensure that they strike on the strike plate.

Étape 6 - Test rotation and feedback from IO screen

The feedback should count up in binary for the position selected


Pos   IxA  IxB  IxC
 1     1    0    0
 2     0    1    0
 3     1    1    0
 4     0    0    1
 5     1    0    1
 6     1    1    1

Étape 7 - Label the turret bolts and capstan positions

Using the IO screen, rotate to position 1.

  1. Using a pneumatic pipe marker, Label the "active" bolt with the number relating to the feedback position
  2. Using a permanent marker, label the capstan where it is clearly visible


Repeat for all 6 positions

Commentaires

Draft