R0015336 Pneumatic Output Testing : Différence entre versions

[version en cours de rédaction][version en cours de rédaction]
(Contenu remplacé par « {{Tuto Details |Main_Picture=R0015336_Pneumatic_Output_Testing_Screenshot_2023-10-23_135339.png |Main_Picture_annotation={"version":"2.4.6","objects":[{"type":"image",... »)
(Balise : Remplacé)
 
(3 révisions intermédiaires par le même utilisateur non affichées)
Ligne 9 : Ligne 9 :
 
}}
 
}}
 
{{Introduction
 
{{Introduction
|Introduction=<translate><u>'''Tools Required'''</u>
+
|Introduction=<translate>27/08/2025
  
  
PCL airline connection
+
Moved to Confluence
  
12mm blanking ports
 
  
Valve Manual over ride tool
+
Click [https://stuga-ltd.atlassian.net/wiki/external/ZjJkMDQ0MDA4NWNhNGY1OGE2ODIxN2EwNmZjNGFhZjQ Here]</translate>
 
 
Standard screwdriver set
 
 
 
Additional colleague when setting regulator pressures for outputs 
 
 
 
 
 
<u>'''Parts required'''</u>
 
 
 
 
 
R0015040 completed module</translate>
 
 
}}
 
}}
 
{{Materials}}
 
{{Materials}}
 
{{EPI}}
 
{{EPI}}
 
{{Tuto Step
 
{{Tuto Step
|Step_Title=<translate>Safety</translate>
+
|Step_Title=<translate></translate>
|Step_Content=<translate>Output testing will require valve operation with no e/s circuit
+
|Step_Content=<translate></translate>
 
 
 
 
Ensure the following
 
 
 
 
 
Work area is clear from all components not required for testing
 
 
 
 
 
All colleagues are aware of the procedure being undertaken
 
 
 
 
 
No additional colleagues are working on the module
 
 
 
 
 
PCL coupling is accessible to release pressure in case of emergency
 
 
 
 
 
Testing procedure is fully adhered to</translate>
 
|Step_Picture_00=R0015338_Bench_Assemble_Serial_Plate_caution.png
 
}}
 
{{Tuto Step
 
|Step_Title=<translate>Set Air service unit soft start</translate>
 
|Step_Content=<translate>Wind fully out soft start screw situated on top on main air service unit</translate>
 
|Step_Picture_00=R0015336_Pneumatic_Output_Testing_Screenshot_2023-10-23_135953.png
 
}}
 
{{Tuto Step
 
|Step_Title=<translate>Check all open ports</translate>
 
|Step_Content=<translate>Ensure all open ports and trailing pipes are suitably blanked</translate>
 
|Step_Picture_00=R0015336_Pneumatic_Output_Testing_Screenshot_2023-10-23_135953.png
 
}}
 
{{Tuto Step
 
|Step_Title=<translate>Connect main PCL</translate>
 
|Step_Content=<translate>Connect main pcl air feed to air service unit
 
 
 
 
 
Increase Air service unit pressure to 6.0bar /6mpa</translate>
 
|Step_Picture_00=R0015336_Pneumatic_Output_Testing_Screenshot_2023-10-23_135953.png
 
}}
 
{{Tuto Step
 
|Step_Title=<translate>Check for leaks</translate>
 
|Step_Content=<translate>Check for audible leaks on the red pipe lines installed and correct if found
 
 
 
 
 
Check air gun regulator functions properly . Fully open the regulator (2 bar limited ) and test air gun assembly</translate>
 
|Step_Picture_00=R0015336_Pneumatic_Output_Testing_Screenshot_2023-10-23_140328.png
 
}}
 
{{Tuto Step
 
|Step_Title=<translate>Manual overide</translate>
 
|Step_Content=<translate>Enable the manual over ride on the main air service unit
 
 
 
 
 
This will purge the system with air.</translate>
 
|Step_Picture_00=R0015336_Pneumatic_Output_Testing_Screenshot_2023-10-23_135953.png
 
}}
 
{{Tuto Step
 
|Step_Title=<translate>Check for leaks</translate>
 
|Step_Content=<translate>Check for audible leaks on blue Pipe line, and active control pipes to cylinders and regulators</translate>
 
|Step_Picture_00=R0015336_Pneumatic_Output_Testing_Screenshot_2023-10-23_140649.png
 
}}
 
{{Tuto Step
 
|Step_Title=<translate>Check home positions</translate>
 
|Step_Content=<translate>With the system in the natural state when over ridden, the following cylinder positions should be confirmed</translate>
 
|Step_Picture_00=R0015338_Bench_Assemble_Serial_Plate_caution.png
 
}}
 
{{Tuto Step
 
|Step_Title=<translate>home positions for outputs</translate>
 
|Step_Content=<translate>Y80 Infeed Top clamp contracted
 
 
 
Y82 Outfeed top clamp contracted
 
 
 
Y91 eject cylinder contracted
 
 
 
Y202 clamp infeed side  extended
 
 
 
Y204 Clamp pos contracted
 
 
 
Y206 Centralise contracted</translate>
 
|Step_Picture_00=R0015336_Pneumatic_Output_Testing_Screenshot_2023-10-23_140649.png
 
}}
 
{{Tuto Step
 
|Step_Title=<translate>home positions for outputs</translate>
 
|Step_Content=<translate>Y207 Saw cut contracted
 
 
 
Y210 Z support infeed contracted
 
 
 
Y213 Saw blowers switched off
 
 
 
Y214 Z turret infeed  Not moving
 
 
 
Y215 Z turret outfeed . Not moving
 
 
 
Y224 Z support outfeed contracted
 
 
 
<br /></translate>
 
|Step_Picture_00=R0015336_Pneumatic_Output_Testing_Screenshot_2023-10-23_140649.png
 
}}
 
{{Tuto Step
 
|Step_Title=<translate>If any deviation from the above</translate>
 
|Step_Content=<translate>If any deviation from the above check pipe connections to incorrect output</translate>
 
|Step_Picture_00=R0015338_Bench_Assemble_Serial_Plate_caution.png
 
}}
 
{{Tuto Step
 
|Step_Title=<translate>Manual valve over ride</translate>
 
|Step_Content=<translate>Each valve can be manually fired from the over ride button. Pressing this will activate the valve and fire the cylinder /output
 
 
 
 
 
when a valve is over ridden, ensure attention is paid to any new air leaks that could become present in the active line when fired</translate>
 
|Step_Picture_00=R0015336_Pneumatic_Output_Testing_Screenshot_2023-10-23_140649.png
 
}}
 
{{Tuto Step
 
|Step_Title=<translate>Y80 Clamp infeed top</translate>
 
|Step_Content=<translate>Fire and hold valve
 
 
 
 
 
Adjust regulator to 2 M.P.A
 
 
 
 
 
Cylinder should extend
 
 
 
 
 
Should retract when valve released</translate>
 
|Step_Picture_00=R0015336_Pneumatic_Output_Testing_Screenshot_2023-10-23_140649.png
 
}}
 
{{Tuto Step
 
|Step_Title=<translate>Y82 Clamp outfeed top</translate>
 
|Step_Content=<translate>Fire and hold valve
 
 
 
 
 
Cylinder should extend
 
 
 
 
 
Should retract when valve released</translate>
 
|Step_Picture_00=R0015336_Pneumatic_Output_Testing_Screenshot_2023-10-23_140649.png
 
}}
 
{{Tuto Step
 
|Step_Title=<translate>Y91 Eject</translate>
 
|Step_Content=<translate>Fire and hold valve
 
 
 
 
 
Eject table should move away from saw head
 
 
 
 
 
Should retract when valve released</translate>
 
|Step_Picture_00=R0015336_Pneumatic_Output_Testing_Screenshot_2023-10-23_140649.png
 
}}
 
{{Tuto Step
 
|Step_Title=<translate>Y202 Side clamp</translate>
 
|Step_Content=<translate>Fire and hold valve
 
 
 
 
 
Set regulator to 2 M.P.A
 
 
 
 
 
Side clamp should move towards backfence rollers
 
 
 
 
 
Should retract when valve released</translate>
 
|Step_Picture_00=R0015336_Pneumatic_Output_Testing_Screenshot_2023-10-23_140649.png
 
}}
 
{{Tuto Step
 
|Step_Title=<translate>Y204 Clamp position</translate>
 
|Step_Content=<translate>Fire and hold valve
 
 
 
 
 
Clamps should move towards from of machine.
 
 
 
 
 
If movement is slow/not present  check flow restrictors on back of electrical cabinet identified as 2049
 
 
 
 
 
Should retract when valve released</translate>
 
|Step_Picture_00=R0015336_Pneumatic_Output_Testing_Screenshot_2023-10-23_140649.png
 
}}
 
{{Tuto Step
 
|Step_Title=<translate>Y206 Centralise</translate>
 
|Step_Content=<translate>Fire and hold valve
 
 
 
 
 
Set regulator to 2 M.P.A
 
 
 
 
 
Saw head should move towards rear of machine
 
 
 
 
 
Should retract when valve released
 
 
 
<br /></translate>
 
|Step_Picture_00=R0015336_Pneumatic_Output_Testing_Screenshot_2023-10-23_140649.png
 
}}
 
{{Tuto Step
 
|Step_Title=<translate>Y207 saw cut</translate>
 
|Step_Content=<translate>Fire and hold valve
 
 
 
 
 
Saw head should raise up
 
 
 
 
 
Should retract when valve released</translate>
 
|Step_Picture_00=R0015336_Pneumatic_Output_Testing_Screenshot_2023-10-23_140649.png
 
}}
 
{{Tuto Step
 
|Step_Title=<translate>Y210 Z support infeed</translate>
 
|Step_Content=<translate>Fire and hold valve
 
 
 
 
 
Infeed side z block should fire towards back fence
 
 
 
 
 
Should retract when valve released</translate>
 
|Step_Picture_00=R0015336_Pneumatic_Output_Testing_Screenshot_2023-10-23_140649.png
 
}}
 
{{Tuto Step
 
|Step_Title=<translate>Y212 Hi low pressure</translate>
 
|Step_Content=<translate>assistance required from colleague
 
 
 
 
 
Fire and hold Y80 output , infeed top clamp should move down. Keep Y80 held down
 
 
 
 
 
Top clamp block pressure should be weak enough to override by hand and move clamp back towards cylinder
 
 
 
 
 
Additionally fire Y212,  this should switch clamp to high pressure and stop clamp being able to be over ridden by hand</translate>
 
|Step_Picture_00=R0015336_Pneumatic_Output_Testing_Screenshot_2023-10-23_143932.png
 
|Step_Picture_01=R0015336_Pneumatic_Output_Testing_Screenshot_2023-10-23_140649.png
 
}}
 
{{Tuto Step
 
|Step_Title=<translate>Y213 Saw blowers</translate>
 
|Step_Content=<translate>Fire and hold valve
 
 
 
 
 
Blowers should switch on
 
 
 
 
 
Check operation of inline flow controllers .
 
 
 
 
 
When fully closed air flow should stop completely. If air flow can not be completely stopped by flow controller, it is fitted the wrong way around.  Change and recheck if this occurs</translate>
 
|Step_Picture_00=R0015336_Pneumatic_Output_Testing_Screenshot_2023-10-23_140649.png
 
}}
 
{{Tuto Step
 
|Step_Title=<translate>Y214 Z turret infeed</translate>
 
|Step_Content=<translate>Fire and hold valve
 
 
 
 
 
Infeed turret should rotate once
 
 
 
 
 
Release and fire valve again and turret should again rotate one position</translate>
 
|Step_Picture_00=R0015336_Pneumatic_Output_Testing_Screenshot_2023-10-23_140649.png
 
}}
 
{{Tuto Step
 
|Step_Title=<translate>Y215 Z turret outfeed</translate>
 
|Step_Content=<translate>Fire and hold valve
 
 
 
Outfeed turret should rotate once
 
 
 
Release and fire valve again and turret should again rotate one position</translate>
 
|Step_Picture_00=R0015336_Pneumatic_Output_Testing_Screenshot_2023-10-23_140649.png
 
}}
 
{{Tuto Step
 
|Step_Title=<translate>Y224 Z support outfeed</translate>
 
|Step_Content=<translate>Fire and hold valve
 
 
 
Outfeed side z block should fire towards back fence
 
 
 
Should retract when valve released</translate>
 
|Step_Picture_00=R0015336_Pneumatic_Output_Testing_Screenshot_2023-10-23_140649.png
 
}}
 
{{Tuto Step
 
|Step_Title=<translate>output testing complete</translate>
 
|Step_Content=<translate>Disconnect pcl air supply
 
 
 
 
 
Remove temporary blanks fitted</translate>
 
|Step_Picture_00=R0015336_Pneumatic_Output_Testing_Screenshot_2023-10-23_135953.png
 
 
}}
 
}}
 
{{Notes}}
 
{{Notes}}

Version actuelle datée du 27 août 2025 à 13:35

Auteur avatarGareth Green | Dernière modification 27/08/2025 par Gareth Green en cours de rédaction

Details for manual pneumatic output testing on module

Difficulté
Moyen
Durée
1 heure(s)

Introduction

27/08/2025


Moved to Confluence


Click Here

Étape 1 -

Commentaires

Draft