− | |Duration= | + | |Duration=8 |
|Duration-type=hour(s) | |Duration-type=hour(s) | ||
}} | }} |
Details for mounting cylinder rails to transfer beams
Auteur Gareth Green | Dernière modification 3/04/2024 par Gareth Green en cours de rédaction ⧼frevu-button-review-label⧽
Details for mounting cylinder rails to transfer beams
R0015292_Install_Cylinder_Rails_and_Align_Screenshot_2023-10-30_081130.png
Tools Required
Standard spanner set
Standard hex key set
Tape measure
Wire line
Pneumatic cylinder setting jig
Parts Required
R0015288 Bench Assemble Transfer slid units and cylinder rails
Use Loctite 243 on all fasteners
Use Loctite 572 on all threaded pneumatic connection
Pen mark all fasteners to show finalised
Remove safety bolt stop from cylinder rails
Adjust delrin wheels on section shown
Ensure to use Setting Delrin Transfer Table Wheel Tension To set delrin wheels correctly
Adjust delrin wheels on section shown
Ensure to use Setting Delrin Transfer Table Wheel Tension To set delrin wheels correctly
Check all fasteners are correctly tensioned
Ensure all delrin wheels are correctly set and all fasteners on delrin wheels are tensioned to final tension
All cylinders should be checked for correct height position in regards to top face of transfer arms
All cylinders should be below the top face of the transfer arm,
Check with 2 meter straight edge over tops of transfer arms
Mesh requires setting between slider unit and drive pinion
It is vital that the correct drive meshing is achieved.
Complete the following steps to mesh pinion and drive correctly
Once drive racks have been set, it is vital to check that no interference between rack and arm is present. Move racks along full length of travel and check for any fouling
1 Slide drive pinion away from rack , this pinion shou. be loose and free moving
2 Move cylinder rail to position shown
3 Slide Pinion into position under drive rack
4 Adjust Backlash between rack and pinion to give no more than 1mm movement
Set cylinder rails to hepco rail by completing the following steps
1 Set cylinder rails 1 and 8 to same measurement to hepco beam, using same technique of sliding drive pinion out of the way to enable movement
2 For finer tuning of position, Use slots in rack mounting and drive gear position to adjust
Attach pneumatic jig to cylinders , to enable cylinder pistons to be extended
Using the same method, position the remaining cylinder assemblies to the wire line
Double check setting by measuring from cylinder piston to hepco rail on each cylinder assembly
All measurements should be the same -+ 0.5mm
Remove, apply adhesive and finalise 2 off M6 grubscrew per each drive pinion
Fit hard stop assemblies once alignment is set
Fasteners and size required
Once all settings have been set, Delrin wheel tension should be rechecked before final sign off
All delrin wheels should be set and be able to be stopped from rotating when held with light finger pressure. . Ensure all delrin wheels are checked on transfer assembly to ensure correct setting