[version en cours de rédaction] | [version en cours de rédaction] |
(Page créée avec « {{Tuto Details |Main_Picture=R0015114_Bench_Assemble_Valve_Banks_and_Regulators_Screenshot_2023-11-02_074048.png |Main_Picture_annotation={"version":"2.4.6","objects":[{"t... ») |
|||
(3 révisions intermédiaires par le même utilisateur non affichées) | |||
Ligne 5 : | Ligne 5 : | ||
|Categories=Production | |Categories=Production | ||
|Difficulty=Hard | |Difficulty=Hard | ||
− | |Duration=1 | + | |Duration=1.5 |
|Duration-type=hour(s) | |Duration-type=hour(s) | ||
}} | }} | ||
Ligne 13 : | Ligne 13 : | ||
Standard screwdriver set | Standard screwdriver set | ||
+ | |||
+ | Standard grease gun and cartridge | ||
Ligne 38 : | Ligne 40 : | ||
|Step_Content=<translate>Blank off all unused bulkhead and connection ports not required</translate> | |Step_Content=<translate>Blank off all unused bulkhead and connection ports not required</translate> | ||
|Step_Picture_00=R0015338_Bench_Assemble_Serial_Plate_caution.png | |Step_Picture_00=R0015338_Bench_Assemble_Serial_Plate_caution.png | ||
+ | }} | ||
+ | {{Tuto Step | ||
+ | |Step_Title=<translate>Lubrication</translate> | ||
+ | |Step_Content=<translate>All lubrication points should be greased prior to testing | ||
+ | |||
+ | |||
+ | ensure the following are greased | ||
+ | |||
+ | |||
+ | '''<u>Leadscrews</u>''' | ||
+ | |||
+ | Z axis leadscrew 2off leadscrews 1 off grease point per leadscrew | ||
+ | |||
+ | Y Axis Leadscrew 1 off grease point | ||
+ | |||
+ | VZ axis leadscrew 1 off grease point | ||
+ | |||
+ | '''<u>Bearings</u>''' | ||
+ | |||
+ | 4 off Y axis bearings | ||
+ | |||
+ | 4 off Z axis bearings | ||
+ | |||
+ | 8 off VZ axis bearings | ||
+ | |||
+ | |||
+ | |||
+ | <br /></translate> | ||
+ | |Step_Picture_00=R0015320_Pneumatic_Output_Test_Screenshot_2023-11-06_113551.png | ||
}} | }} | ||
{{Tuto Step | {{Tuto Step | ||
Ligne 159 : | Ligne 190 : | ||
Clamps should move towards datum rollers | Clamps should move towards datum rollers | ||
+ | |||
+ | Check that P0000160 flow regulators are orientated correctly. When fully wound in on adjustment, cylinder stroke should not be possible when the valve is manually fired. If flow regulation is not possible, orientation is incorrect | ||
<br /></translate> | <br /></translate> | ||
Ligne 201 : | Ligne 234 : | ||
− | Clamps should move towards datum rollers when fired</translate> | + | Clamps should move towards datum rollers when fired |
+ | |||
+ | Check that P0000160 flow regulators are orientated correctly. When fully wound in on adjustment, cylinder stroke should not be possible when the valve is manually fired. If flow regulation is not possible, orientation is incorrect</translate> | ||
|Step_Picture_00=R0015320_Pneumatic_Output_Test_Screenshot_2023-11-02_085644.png | |Step_Picture_00=R0015320_Pneumatic_Output_Test_Screenshot_2023-11-02_085644.png | ||
}} | }} | ||
Ligne 211 : | Ligne 246 : | ||
{{Notes}} | {{Notes}} | ||
{{PageLang | {{PageLang | ||
+ | |Language=en | ||
|SourceLanguage=none | |SourceLanguage=none | ||
|IsTranslation=0 | |IsTranslation=0 | ||
− | |||
}} | }} | ||
{{Tuto Status | {{Tuto Status | ||
|Complete=Draft | |Complete=Draft | ||
}} | }} |
Testing procedure for installed pneumatics
Auteur Gareth Green | Dernière modification 4/12/2023 par Gareth Green en cours de rédaction ⧼frevu-button-review-label⧽
Testing procedure for installed pneumatics
R0015114_Bench_Assemble_Valve_Banks_and_Regulators_Screenshot_2023-11-02_074048.png
Tools Required
Standard screwdriver set
Standard grease gun and cartridge
Parts Required
Output testing will be carried out under a no-emergency stop situation
ensure pcl coupling is used for ability for quick disconnection
Ensure all colleagues are aware of testing and ensure good working practise is followed
All lubrication points should be greased prior to testing
ensure the following are greased
Leadscrews
Z axis leadscrew 2off leadscrews 1 off grease point per leadscrew
Y Axis Leadscrew 1 off grease point
VZ axis leadscrew 1 off grease point
Bearings
4 off Y axis bearings
4 off Z axis bearings
8 off VZ axis bearings
Ensure soft start adjuster is fully wound out
Set air service unit to 6 bar
Check for audible leaks and correct if required
Check operation of air gun . Ensure pressure is set to maximum of 2 bar
Set Z axis support pressure. Set at 5 bar, and adjust to balance. Rotary ring should be held in position under cylinder pressure, but be able able to be moved up and down by turning the leadscrew by hand
If resistance is felt or axis bounces when leadscrew is turned , check air connections for correct piping
Manually override air service unit to purge Blue ring main
Caution All cylinders should move to their home positions
Check for audible leaks from ring main and cylinder connections
Check for leaks when all outputs are individually fire also
Home position Blower should be switched off
Fire valve, blower should activate on tool break sensor assembly
Check orientation of in line flow regulator . Fully closed, air feed should stop totally . If not possible, flow regulator is fitted incorrectly
Home position is retracted away from bottom rollers
Manually fire valve, cylinder should move toward datum rollers
Home position should be lifted up
Manually fire valve, set regulator pressure to 2 bar
Clamp should move down when fired
Home position should be retracted away from datum rollers
Manually fire valve, set regulator pressure to 2 bar
Clamp should move in when fired
Home position Blower should be switched off
Fire valve, blower should activate on infeed datum roller assembly
Check orientation of in line flow regulator . Fully closed, air feed should stop totally . If not possible, flow regulator is fitted incorrectly
Shared Output for top and side clamp
Home positions are
side clamp retracted away from datum rollers
Top clamp retracted away from datum rollers
Manually fire valve
Set
Y386 side clamp regulator to 2 bar
Y386 top clamp regulator to 2 bar
Clamps should move towards datum rollers
Check that P0000160 flow regulators are orientated correctly. When fully wound in on adjustment, cylinder stroke should not be possible when the valve is manually fired. If flow regulation is not possible, orientation is incorrect
Ensure all clamps are clear from V notch cut axis
Home position should be up
Manually fire valve
V notch assembly should move down towards the floor
Y395 is a shared output for V top and side clamp
Home positions are
side clamp retracted away from datum rollers
Top clamp retracted away from datum rollers
Manually fire valve
Set
Y395 side clamp regulator to 4 bar
Y395 top clamp regulator to 4 bar
Clamps should move towards datum rollers when fired
Check that P0000160 flow regulators are orientated correctly. When fully wound in on adjustment, cylinder stroke should not be possible when the valve is manually fired. If flow regulation is not possible, orientation is incorrect