R0015319 Fit Guards and Doors : Différence entre versions

[version en cours de rédaction][version en cours de rédaction]
Ligne 53 : Ligne 53 :
 
|Step_Content=<translate>Fit re assembled rear panel</translate>
 
|Step_Content=<translate>Fit re assembled rear panel</translate>
 
|Step_Picture_00=R0015319_Fit_Guards_and_Doors_Screenshot_2023-11-01_164142.png
 
|Step_Picture_00=R0015319_Fit_Guards_and_Doors_Screenshot_2023-11-01_164142.png
 +
}}
 +
{{Tuto Step
 +
|Step_Title=<translate>Alignment</translate>
 +
|Step_Content=<translate>It is vital that door locks should align correctly.
 +
 +
 +
Handle operation should be smooth and no force required to engage locking pins
 +
 +
Any discrepancies should be reported</translate>
 +
|Step_Picture_00=R0008013_Clacker_assembly_quality.png
 
}}
 
}}
 
{{Tuto Step
 
{{Tuto Step
Ligne 69 : Ligne 79 :
  
  
Ensure door switches are set correctly. Interlock blade must fully penetrate the guard switch</translate>
+
Ensure door switches are set correctly. Interlock blade must fully penetrate the guard switch, and align with no catching as entering the interlock</translate>
 
|Step_Picture_00=R0015319_Fit_Guards_and_Doors_Screenshot_2023-11-01_164556.png
 
|Step_Picture_00=R0015319_Fit_Guards_and_Doors_Screenshot_2023-11-01_164556.png
 
}}
 
}}

Version du 27 novembre 2023 à 12:50

Auteur avatarGareth Green | Dernière modification 3/04/2024 par Gareth Green en cours de rédaction

Introduction

Tools Required


standard hex key set

Standard spanner set

Standard HSS drill set

Standard tap set

Long reach 4.2mm drill

Extended M5 tap


Parts Required


R0015321 Bench assemble guards and doors


Étape 1 - Unless otherwise stated

Use locktite 243 on all fasteners

Use loctite 572 on all threaded pneumatic connection

Pen mark all fasteners to show finalised



Étape 2 - Fit roof panel

Fit pre assembled roof panel



Étape 3 - Fit rear panel

Fit re assembled rear panel



Étape 4 - Alignment

It is vital that door locks should align correctly.


Handle operation should be smooth and no force required to engage locking pins

Any discrepancies should be reported



Étape 5 - Fit Guard Doors

Fit 4 off Pre assembled guard doors to hinges



Étape 6 - Drill door lock pins

Drill off door lock pins and strike plates



Étape 7 - Drill and set interlock switches

Set and drill door interlock switches


Ensure door switches are set correctly. Interlock blade must fully penetrate the guard switch, and align with no catching as entering the interlock



Étape 8 - Fit Front panel

Fit front upper front panel



Commentaires

Draft