[version en cours de rédaction] | [version en cours de rédaction] |
Ligne 133 : | Ligne 133 : | ||
{{Tuto Step | {{Tuto Step | ||
|Step_Title=<translate>Attach trunking</translate> | |Step_Title=<translate>Attach trunking</translate> | ||
− | |Step_Content=<translate>Attach a length of trunking @ 1310mm | + | |Step_Content=<translate>Attach a length of 75mm x 25mm trunking @ 1310mm, 1200mm from non slotted end to rear of maytec and use M5 x 6 button sockets to secure |
Ligne 150 : | Ligne 150 : | ||
Space as follows | Space as follows | ||
− | 1st ethercat box 100mm from end of maytec, second ethercat box butted against 1st. | + | 1st ethercat box 100mm from end of maytec non slotted end, second ethercat box butted against 1st. |
All other components should be spaced at 100mm except for Valve 1 and Valvebank 1 which are spaced at 150mm | All other components should be spaced at 100mm except for Valve 1 and Valvebank 1 which are spaced at 150mm | ||
Ligne 158 : | Ligne 158 : | ||
− | Valve bank 1 and 2 secured with M4 x 40 socket caps and | + | Valve bank 1 and 2 secured with M4 x 40 socket caps and M8 motor plate washers, spaced away from maytec rail with 2 M8 washers to enable valve to sit straight |
Bench assembly instructions for pneumatics rail
Auteur Gareth Green | Dernière modification 3/04/2024 par Gareth Green en cours de rédaction ⧼frevu-button-review-label⧽
Bench assembly instructions for pneumatics rail
R0015071_Bench_Assemble_Pneumatics_Rail_Screenshot_2023-06-12_141255.png
Tools Required
Standard hex key set
Standard spanner set
Pipe cutters
Standard HSS drill set
Step cutting drill
Standard screwdriver set
Parts Required
D0010167 x 3
C0001018 x 3
D0016300 x 1
P0001139 x 1
P0001102 x 2
P0001032 x 2
P0001068 x 1
P0001101 x 3
P0001163 x 8
P0001071 x 1
P0001186 x 10
P0001151 x 1
A0000240 x 1
P0000159 x 5Use Loctite 243 on all fasteners
Use Loctite 572 on all pneumatic threaded connections
Pen mark all fasteners to show finalised
Assemble as shown for R to L machine
Mirror assembly for L to R machine
Attach Fitting P0001102 to valve P0001139 as shown . Add 2 off P0001032 silencers as indicated
Assemble valve bank 1 as shown using
P0001068 valve base x 1
P0001186 valve x 2
P0001101 fitting x 2
P0001163 fitting x 4
Assemble valve bank 2 as shown using
P0001071 valve base x 1
P0001186 valve x 8
P0001101 fitting x 1
P0001102 fitting x 1
P0001163 x 4
P0000159 x 4 ( information required for which ports to blank)
Connection box A0000240 will require holes adding to use.
Drill 2 off 5mm holes on back face to allow mounting on rail as shown. Use M4 socket caps and washers
Drill top face to mount A0000105 gland and fix with A0000255 nut
Mount ether cat boxes C0001018 to mounting plates D0010167 using m3 x 20 panhead bolts
Attach a length of 75mm x 25mm trunking @ 1310mm, 1200mm from non slotted end to rear of maytec and use M5 x 6 button sockets to secure
Ecr raised to add holes to maytec section on 05/09/23
Holes will required drilling until ecr finalises
1st m5 hole 130mm from non slotted hole end , then spaced at 250mm Drill and tap m5
Attach built assemblies to mounting bar D0016300 as shown using the following fixings
Space as follows
1st ethercat box 100mm from end of maytec non slotted end, second ethercat box butted against 1st.
All other components should be spaced at 100mm except for Valve 1 and Valvebank 1 which are spaced at 150mm
Valve 1 uses bracket P0001151 to attach using M4 x 12 socket caps and A form washers
Valve bank 1 and 2 secured with M4 x 40 socket caps and M8 motor plate washers, spaced away from maytec rail with 2 M8 washers to enable valve to sit straight
Ethercat mount plates use m6 x 16 socket caps and a form washers
Connection box uses M4 x 12 socket caps and washers
Make sure identification markers are safely stored with assembly ready for electrical terminations at a later point
en none 0 Draft
Vous avez entré un nom de page invalide, avec un ou plusieurs caractères suivants :
< > @ ~ : * € £ ` + = / \ | [ ] { } ; ? #