  • 1 Y207 Saw cut contracted 2 Y210 Z support infeed contracted 3 Y213 Saw blowers switched off 4 Y214 Z turret infeed Not moving 5 Y215 Z turret outfeed . Not moving 6 Y224 Z support outfeed contracted <br/>  +
  • 1 Y80 Infeed Top clamp contracted 2 Y82 Outfeed top clamp contracted 3 Y91 eject cylinder contracted 4 Y202 clamp infeed side extended 5 Y204 Clamp pos contracted 6 Y206 Centralise contracted  +
  • Check for audible leaks on blue Pipe line, and active control pipes to cylinders and regulators  +
  • Check for audible leaks on the red pipe lines installed and correct if found Check air gun regulator functions properly . Fully open the regulator (2 bar limited ) and test air gun assembly  +
  • Connect main pcl air feed to air service unit Increase Air service unit pressure to 6.0bar  +
  • Each valve can be manually fired from the Each valve can be manually fired from the over ride button. Pressing this will activate the valve and fire the cylinder /output when a valve is over ridden, ensure attention is paid to any new air leaks that could become present in the active line when firedcome present in the active line when fired  +
  • Enable the manual over ride on the main air service unit This will purge the system with air.  +
  • Ensure all open ports and trailing pipes are suitably blanked  +
  • Fire and hold valve Adjust regulator to 0.2 M.P.A Cylinder should extend Should retract when valve released  +
  • Fire and hold valve Clamps should move towards from of machine. If movement is slow/not present check flow restrictors on back of electrical cabinet identified as 2049 Should retract when valve released  +
  • Fire and hold valve Cylinder should extend Should retract when valve released  +
  • Fire and hold valve Eject table should move away from saw head Should retract when valve released  +
  • Fire and hold valve Set regulator to 0.2 M.P.A Side clamp should move towards backfence rollers Should retract when valve released  +
  • If any deviation from the above check pipe connections to incorrect output  +
  • Machine lubrication must be completed befoMachine lubrication must be completed before operation of mechanical components Grease following points with grease gun 1 Eject bearings. 4 off grease nipples. Apply grease until it starts to exit bearing 2 Saw head bearing. 4 off greasing nipples. Apply grease until it starts to exit bearing 3 SY Axis bearings. 4 off greasing nipples. Apply grease until it starts to exit bearing
    se until it starts to exit bearing <br/>  +
  • Output testing will require valve operatioOutput testing will require valve operation with no e/s circuit Ensure the following Work area is clear from all components not required for testing All colleagues are aware of the procedure being undertaken No additional colleagues are working on the module PCL coupling is accessible to release pressure in case of emergency Testing procedure is fully adhered toy Testing procedure is fully adhered to  +
  • Wind fully out soft start screw situated on top on main air service unit  +
  • With the system in the natural state when over ridden, the following cylinder positions should be confirmed  +