Rechercher dans les propriétés de la page

Rechercher dans les propriétés de la page

Entrer soit une page et une propriété, ou seulement une propriété, pour récupérer toutes les valeurs affectées.

Affichage de 9 résultats à partir du n°1.

Voir (20 précédentes | 20 suivantes) (20 | 50 | 100 | 250 | 500).


    

Liste de résultats

  • 1 Finalise all fasteners shown. 8 off M8 1 Finalise all fasteners shown. 8 off M8 indicated should be set to 40 nm toque setting Once final adjustment has been done, recheck all settings as movement is possible when adjusting 2 Table /roller squareness 3 Roller alignment 4 Roller height
    {{{1}}}
    gt;</div> <div class="icon-instructions-text">{{{1}}}</div> </div>  +
  • 1 Set heights of all rollers to cut tables to a gap of 1.5 mm . tolerance -+0.5mm 2 Use slots shown for main adjustment 3 Use counterbores shown for fine adjustment 4 Check all measurements on all rollers are correct  +
  • 1 Use 1 meter straight edge to check alig1 Use 1 meter straight edge to check alignment of rollers. Identify which direction movement is required to achieve alignment of all rollers. Tolerance 0.002"/0.05mm 2 Adjust using shim at indicated point on either / both arms
    ...Each arm should only ever have 1 side with shim This retains datum positions
    3 Adjust until all roller are within tolerance to straight edge
    </div> </div> 3 Adjust until all roller are within tolerance to straight edge  +
  • 1 Use engineers square to check squarenes1 Use engineers square to check squareness of roller fences to cut tables. Check at multiple points 2 Identify movement required to adjust square. Gap between square and roller: Top = add shim to top of bar Bottom = Add shim to bottom of bar 3 Cut and add shim ensuring shim bottoms out on M8 fastener, as this will act as a datum
    ...Only use single shims to adjust , do not add shims together to increase size.
    4 Adjust until rollers are square with full tension on M8 fixings
    > </div> 4 Adjust until rollers are square with full tension on M8 fixings<br/>  +
  • Attach pre build roller fences to backfence support bar using M6 x 35 socket caps . Do not apply adhesive  +
  • Attach pre machined back fence support to main frame Use 4 off M8 x 25 socket caps , do not apply adhesive Set assembly to maximum height position in fixing slots  +
  • Once all fasteners are finalised and settings checked, shim over hangs must be removed. Ensure no cut points are left from exposed shims  +
  • Tolerance in following step must be adhered to Ensure all measurements are set equal so roller fences are the same height above tables To confirm the gap must be no bigger than 2mm between rollers and cut tables  +
  • Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised  +