  • 1 Grease eject support blocks 2 Assemble with pre built support block 3 Fix to frame with M6 x 60 socket caps . Do not use adhesive at this point 4 Check for smooth operation  +
  • 1 Clean shafts with Fe solvent 2 Insert shafts into rod base as shown , orientate dimples on shafts as shown in relation to rod base holes 3 Fix to eject support post as shown using M8 x 80 socket caps 4 off. Do not use adhesive  +
  • 1 Use engineers level at indicated points 1 Use engineers level at indicated points to set base level. Use marker pen to outline level positions, so consistent point is used each time the level is moved to a new position 2 Adjust using jacking screws on support brackets 3 Ensure all 3 indicated points are set levelnsure all 3 indicated points are set level  +
  • 1 Use engineers level to check level of ej1 Use engineers level to check level of eject assembly at 3 points of movement. 2 Adjust base evenly to maintain base level , to adjust eject shafts level 3 Once correct height of base is achieved to set eject shafts level, and a discrepancy is noticeable on level of eject shafts at 3 positions , recheck previous step for being set level recheck previous step for being set level  +
  • 1 slide lower shaft into eject support blo1 slide lower shaft into eject support block as shown , ensuring dimple aligned with M8 hole in rod base 2 Slide into position upper shaft ensuring dimple in shaft is aligned with rod base M8 hole 3 Add 2 off M8 x 16 kcp grubscrews to captivate shafts into rod base. Use loctite 243 on grubscrews 4 Apply medium pressure to fixings in rod base 5 Add 2 off M8 20 kcp grubscrews to eject support under light tension. Do not add adhesivet under light tension. Do not add adhesive  +
  • Adjusting brackets should be removed indivAdjusting brackets should be removed individually once all settings are complete 1 Place level on base on marked points to use to identify if base moves position when final tension to holding bolts is added 2 Add final tension to fitted M8 socket cap 3 Remove Support bracket 4 Adjust level if moved. Use copper hammer to impact shaft in direction required to adjust level 5 Add and finalise M8 socket cap with same washer configuration as previous fitted M8 6 Remove first M8 fastener, add Loctite 243 and add final tension 7 Adjust height again using step 4 if level indicates movement has occurred when fitting second fastener has occurred when fitting second fastener  +
  • All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added  +
  • Check frame has M6 rivnuts installed If not present install with riv nut applicator Riv nuts must be flush with box section face  +
  • End block level should be checked for level and adjusted to be correct  +
  • Finalise grubscrews in support block indivdually  +
  • Fit ejector tie bars to ejector bearing blocks, using 8 off M6 x 25 set bolts and A form washers . Only apply light tension and do not use adhesive  +
  • Fit pre built bearing blocks to eject shafts Ensure correct orientation as shown  +
  • Recheck all previous settings stated in this procedure, and ensure all have met and retained specified settings Supervisor sign off required  +
  • Repeat step 11 at these points  +