  • 1 Use P0000046 6mm y connection to connec1 Use P0000046 6mm y connection to connect pipes 879 together as shown Use P0000046 6mm y connection to connect pipes 871 together as shown 2 Use 6mm black air pipe to connect each Y connector to valve bank . Connect 871/9 to rightside valve. Connect 871 to port A2 above valve Connect 879 to port A4 above valve 3 Connect 951 to second valve. port A2 connect 959 to second valve, port A4t A2 connect 959 to second valve, port A4  +
  • 1 Connect mains air to 8mm and purge syste1 Connect mains air to 8mm and purge system to mains pressure 2 Check for audible air leaks , and correct if found 3 Check home positions. With the air connected the following home positions should be checked A Y95 Safety gate should be extended out B Y87 Cylinder push should be retracted 4 Manually fire valve on Y95 by pressing over ride button and holding in (C) check that cylinder moves and no air leaks are present when fired Repeat for Y87 output Remove air supply once testing is completeRemove air supply once testing is complete  +
  • 1 Continue looms bring in the two pipes a1 Continue looms bring in the two pipes and continue to the next push cylinder assembly 2 Cut 2 more 6mm black air pipes to run the indicated route and identify and connect as the previous step 3 Add to loom and continue to end of frame, combining reed switches attached to push eject assemblyd switches attached to push eject assembly  +
  • Attach 7 off M0001127 Cable Tie Base (m6) as shown using M5 x 10 button sockets  +
  • Coil cables from loom and hold with tie wrap  +
  • Continue fixing looms until 1st cylinder push assembly is reached  +
  • Cut 2 lengths of 6mm black airline at the right length to follow the indicated route Pipe identifications 871 and 879 Connect pipes to indicated ports on cylinder  +
  • Cut Length of W00010002 cable to follow the route shown , and mark both ends clearly Y94  +
  • Ensure all looms are correctly tethered to retention points , and are not twisted or buckled . Ensure all breaks of pipe work are numbered for identification  +
  • Identification numbers 951 959 1 Cut 2 6mm black air pipes long enough to run the indicated route 2 Identify each pipe, one 951 and one 959 3 Connect pipes to gate as indicated and leave pipes to loom later  +
  • Start to create loom from safety gate AStart to create loom from safety gate Attach to first tiebase and separate pneumatic cables to top lug and cables to lower Pipes 951 and 959, Y94 cable, and reed switches X189 and X190 should be loomed in as shown Y94 should be left with enough length to connect to cut guard beacon when fittedto connect to cut guard beacon when fitted  +
  • Use loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised  +