  • 1 Drill and Tap M12 and fit 2 off M12 x 1 Drill and Tap M12 and fit 2 off M12 x 25 socket caps per side ( 4 off in total ) in lower beam mount 2 Drill 8mm hole and add 8mm spiral pin as shown ( 1 per side ) in lower beam mount 3 Drill 8mm hole and add 8mm spiral pin as shown ( 1 per side ) in upper beam mounts shown ( 1 per side ) in upper beam mount  +
  • 1 Level lower mount Y Axis as shown, using1 Level lower mount Y Axis as shown, using 1 meter straight edge and engineers level. Adjust using lower side M10 grubscrews 2 Level x axis of indicated blocks as shown. Use 2 small parallels and engineers level . Use M10 Grubscrews and M16 bolt beneath to adjust level Repeat for both sidesth to adjust level Repeat for both sides  +
  • Add Loctite 290 to all adjustment grubscrews used 16 off m10 x 12 Add Loctite 243 to M12 socket caps 8 off  +
  • Double check all previous levelling and measurements to confirm all criteria has been met  +
  • Finalise the following fasteners 1 Ensure 8 off grubscrews that hold vertical shaft position are swapped for M8 x 16 kcp grubscrews , glued and tightened 2 Ensure 8 off M16 bolts are glued and tightened  +
  • Measure distance from shaft to front face Measure distance from shaft to front face of beam mount as shown using vernier Check both sides are consistent Calculate new measurement by adding step 2 measurement to vernier measurement for example 30.7mm (vernier measurement0+ 469.5mm (parallel set measurement) = 500.2mm 500.2mm will be the bottom shaft position measurementl be the bottom shaft position measurement  +
  • Quality check required at this stage from supervisor  +
  • Set top beam mount parallel to ring subfraSet top beam mount parallel to ring subframe 1 Measure indicated points both sides 2 Adjust in directions shown to set both measurements to match . release M12 fasteners indicated and adjust using clearance in holes Take note of measurement set to. Accuracy of +- 0.25mmeasurement set to. Accuracy of +- 0.25mm  +
  • Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised  +
  • Use shaft setting block to check level of Use shaft setting block to check level of vertical shafts 1 Attach setting block to 1 off outside shaft as shown 2 Adjust lower beam molunt in direction shown to set level 3 Move setting block to other outer shaft and recheck level. Any discrepancy should be equalised between shaftsrepancy should be equalised between shafts  +
  • Using step 3 calculation, set lower positUsing step 3 calculation, set lower position to measurement obtained 1 Position 2 off small parallels and 1 off large parallel as shown 2 Take indicated measurement 3 Move lower beam mount to achieve correct measurement 4 Ensure 4 off M10 flat bottomed grub screws are touching main frame and hold position with G clamp and support blocks Repeat for opposite side , double check all measurements when adjustment is carried out , until both measurements are exactly set to calculated measurement (tolerance +- 0.25mm )
    easurement (tolerance +- 0.25mm ) <br/>  +
  • V notch sub frame must be square clamps. V notch sub frame must be square clamps. To check this 1 Use 2 meter straight edge against datum rollers as shown 2 Use 2 meter straight edge to align over front face of 4 vertical subframe shafts. Hold in position with 2 quick clamps 3 Use engineers square to check squareness. If this check shows any discrepancy, Recheck all previous settings to identify fault areal previous settings to identify fault area  +