  • 1 Check all levels again after adjusting rollers A and B 2 Use 2 meter straight edge and feeler gauges to check alignment of rollers and cut table Adhere to tolerance of - 0.002"  +
  • 1 Level On X axis using engineers level a1 Level On X axis using engineers level and adjusting grubscrews in indicated areas 2 Level from Rollers at indicated point. Adjust previous level points evenly to adjust level reading on rollers 3 Remove Middle roller and top blower 4 Use 300mm parallels to span rollers and engineers level to check and adjust Y axis level of rollerso check and adjust Y axis level of rollers  +
  • 1 Remove roller from clamp C as shown 2 Use 2 meter straight edge as shown, pushed against roller A and C 3 Ensure Rollers B are moved away from straight edge <br/>  +
  • 1 Use 1 meter straight edge as shown, and hold in position against z axis support blocks 2 Check as shown with engineers square to asses squareness of sub frame to clamps  +
  • 1 Use a 2 meter straight edge to span between rollers A and B 2 Use engineers level on straight edge to identify if either A or B is the low point 3 Raise A or B to bring level  +
  • 1 Level Y axis with engineers level and 300mm parallels. 2 Adjust using M8 flat bottom jacking grubscrews 3 Check and adjust X axis level  +
  • Cut tables must be fitted during this alignment. This will ensure cut tables are accurately set and and any dicrepancies will be identified at this stage . Please ensure all tolerances of maximum 0.002"/0.05 mm is adhered to all times on set up  +
  • Datum C now requires roller refitting and Datum C now requires roller refitting and repositioning 1 Refit roller 2 Slacken 2 off M6 fasteners that hold Roller assembly C in place 3 Ensure straight edge is firmly against roller assemblies A and B 4 Position and Tighten Roller assembly C to align with 2 meter straight edge 5 Check with 0.002" feeler gauge that all rollers are aligned and in tolerancet all rollers are aligned and in tolerance  +
  • Datum rollers B can now be aligned using A and C as the Datum With the 2 meter straight edge against A and C, adjust B to alignment is achieved on back fences Check with 0.002" feeler gauge on all rollers when setting  +
  • Ensure once set, all levels and alignment covered in this procedure, as double checked and confirmed as correct Supervisor sign off required  +
  • Front Bar indicated requires doweling in pFront Bar indicated requires doweling in position 1 Drill 9.5mm to a depth of 25mm into steel support tab at the 2 indicated points 2 Open holes to 10mm diameter 3 Insert 2 off 10mm x 60mm spiral pins to fix position . Ensure dowel is sitting equally between clamp bar and steel supportqually between clamp bar and steel support  +
  • Once dowelling and sign off is complete, remove roller and blower from datum A should be refitted and fasteners finalised .  +
  • Recheck all levels and alignment of rollers in all aspects once squareness setting has been performed. These settings are possible to change after front bar has been adjusted  +
  • Span from roller A to B with 2 meter straight edge Identify if roller C is high or low If high, increase height of rollers A and B and re set levels If low, follow next step for subframe adjustment  +
  • Squareness must be rechecked once Datum rollers B have been aligned , using the same check as step 9  +
  • Squareness of datum faces to sub frame must be set with no tolerance. Perfect squareness should be achieved  +
  • This step is required is centre rollers C require lifting 1 Release lock nut on plate 2 off 2 Release M8 grubscrew 2 off 3 Release M12 socket caps 4 off 4 Adjust in equal turns M10 jacking grubscrews Re level and tighten subframe  +
  • To adjust squareness, indicated bar must be adjusted Always ensure when adjusting that the following is observed <br/> * Indicated bar must not protrude Exterior face of main frame * One side of bar must always remain flush with main frame  +
  • Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised  +