  • 1 Move channel 1 section up or down to co1 Move channel 1 section up or down to copy height of adjacent channel 2. Use the tabs as the reference points 2 Use 2 meter straight edge and level between points indicated Move channel 1 at the end indicated, to give a level reading 3 Tighten bolts to hold in placereading 3 Tighten bolts to hold in place  +
  • 1 Move channel 2 section up or down to co1 Move channel 2 section up or down to copy height of adjacent channel 3. Use the tabs as the reference points 2 Use 2 meter straight edge and level between points indicated Move channel 2 at the end indicated, to give a level reading 3 Tighten bolts to hold in place
    3 Tighten bolts to hold in place <br/>  +
  • 1 Add brace to arm as indicted > bottom1 Add brace to arm as indicted > bottom hole will need drilling into main frame to secure . Drill and tap M6. Position bottom of bracket to dimension shown 2 Repeat Step 8 to mount next arm onto frame. 3 The bottom position of the support brace is determined by the previous arm. Measure Top pitch and replicate below
    Measure Top pitch and replicate below <br/>  +
  • 1 Drill 8mm Diameter holes in all roll pin holes situated between previous tightened m12 bolts ( 19 off in total reference detail 1 ) 2 Insert 8mm x 25mm spiral pins to 8mm holes 3 Clean drilled areas of swarf and cutting fluid  +
  • 1 Mount support channels to frame using m10 x 30 set bolts and m10 A form washers Do not add adhesive at this point to fixings 2 Set all sections mid slot as per picture 3 Slightly tension bolts to hold in place  +
  • 1 Remove Set bolt 2 Add adhesive Loctite 243 to bolt. 3 Refit and tighten 4 Mark head with ink to show completion of fixing 5 Repeat for all M12 fixings holding on mounting sections 1,2 and 3  +
  • 1 Support arm as shown in detail 2 Use 8m1 Support arm as shown in detail 2 Use 8mm x 25mm spiral spin to locate arm on mounting face Use m10 cap heads with no washers to fix arm to mounting face Use Loctite 243 to fix m10's and loosely secure arm to mounting face 3 Adjust arm for level on X axis by using the indicated face to check level with an engineers level 4 Tighten m10 cap heads to lock x axis position on arm and then ink mark bolts as finished 5 Adjust arm for level on Y axis. Use jack on pedestal to adjust height. Use engineers level on indicated point to check levelrs level on indicated point to check level  +
  • <div class="icon-instructions caution-i
    ...Check with supervisor for correct handing and orientation of module and parts before commencing fitting
    1 Fit mounting channels to frame using m12 x 25 Set bolts and A form washers. Do not add adhesive to bolts at this stage . Do not tension bolts. 2 Set the first mounting channel to the middle of the adjustment slot at the extreme end of the frame 3 Place 2 meter straight edge between indicated points , and raise or lower point b to bring straight edge level with engineers level 4 Tighten bolts to hold in place
    to bring straight edge level with engineers level 4 Tighten bolts to hold in place <br/>  +
  • Drill Final 8mm diameter holes at the remaDrill Final 8mm diameter holes at the remaining indicated points , top and bottom, and fit 8mm x 24mm roll pins ow finalise all m10 bolts associated with each dowel , by removing one at a time, adding adhesive and then tightening to final tension. Then mark each bolt as complete with a pen mark. Repeat this on all bolts next to dowels on the drilled blue section
    owels on the drilled blue section <br/>  +
  • Drill indicated remaining 8mm diameter holes next to arms 8 and 9 and fit 8mm roll pins . Then finalise m10 bolts using the same process as before by removing one by one, adding adhesive and then tightening and marking as complete  +
  • Now a datum is set, arms 8 and 9 can be finalised Arms 1 to 7 are used as the datum to set the position of these arms <br/>  +
  • Now the arms are pinned at there local fix points, manipulate the two ends of the blue channel so they are in line with each other repeat this step at both indicated points  +
  • Once at this stage with mounting channels being set in position, a quality check is required from a Supervisor.  +
  • Please take photos so this step can be updPlease take photos so this step can be updated please
    ...Check length of D0015744. Ecr requested (31/07/23) to change length to 754mm . If issued part is 774mm long reduce length by 20mm
    1 Drill arm 8.5mm to suit Maytec section mounting (please supply details So ECR can be generated ) 2 Fit Maytec support assembly as shown Parts used D0015743 x 1 D0015744 x 1 M0000516 x 1 M0001016 x 1 Adjust assembly to support arm correctly
    0015743 x 1 D0015744 x 1 M0000516 x 1 M0001016 x 1 Adjust assembly to support arm correctly  +
  • Quality check from supervisor required at this point to assure correct setting of alignment of arms  +
  • Repeat step 8 and 9 to complete the mounting of the support arms Leave the pedestal as support under beams 8 and 9 <br/>  +
  • Set up a wire line onto the indicated faceSet up a wire line onto the indicated face , and use arms 1 to 7 for reference to set the alignment of arms 8 and 9. Ensure slight gaps on arms 2 to 8 are maintained to ensure the straightness is held along the entire span of arms Y axis position should be double checked when adjustment is complete for alignment of wire line, and adjusted to suit if requiredire line, and adjusted to suit if required  +
  • Supervisor sign off required for alignment  +
  • Use hand tap to Clean threads in sections before fitting D0015037B support channel 3 D0015036B support channel 2 D0015035B support channel 1  +
  • Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised  +