Rechercher dans les propriétés de la page

Rechercher dans les propriétés de la page

Entrer soit une page et une propriété, ou seulement une propriété, pour récupérer toutes les valeurs affectées.

Affichage de 14 résultats à partir du n°1.

Voir (20 précédentes | 20 suivantes) (20 | 50 | 100 | 250 | 500).


    

Liste de résultats

  • All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added  +
  • Connect 12mm blue airpipe from valve banks to end of frame for machine connections  +
  • Feed pipes from valve bank should be run tFeed pipes from valve bank should be run to transfer arm location 4 Identifications will be 2319 2309 2299 Connect to active port on valve bank (4) Fit A000343 energy chain @40 links A0000344 energy chain brackets as shown Mount to D0015577 fixed bracket with M3 x 6 panhead screws and attach to support arm as shown using M4 x 16 socket caps, A form washers and M4 nyloc nuts . Must have a P0000551 Q.E.V fitted to each line Ensure 1.5 m of pipe is left exiting the end of the energy chain
    xiting the end of the energy chain <br/>  +
  • Fit tie bases as shown to gripper support Fit tie bases as shown to gripper support arms . Ecr raised to add holes to drawing 06/11/23 Fit P0001008 Regulator: ARG20 0 - 8.5 Bar c/w Gauge x1 P0001022 Regulator Bracket: to suit P0001008 x 1 to bracket shown Gripper height is lifted for home position identification 1311 Home port of valve bank (2) to nose of cylinder 1312 base of cylinder to out port on regulator Ensure P0000551 Q.E.V are fitted to both grip height cylinder ports 1319 In port of regulator to active port on valve bank (4)egulator to active port on valve bank (4)  +
  • Identification 1461 and 1469 Roller bed is lifted at home position Use P0001030 6mm tee for connections 1461 to home port on valve bank (2) 1469 to active port on valve bank (4) <br/>  +
  • Identification 1479 Connects to active port on valve bank (4) Use P0001030 compact tee to connect Ensure enough loom to allow full range of movement  +
  • Identification 2209 Connected to active port of valve bank (4)  +
  • Identification 2419 Must have flow regulation P0000160 Split feed with P0001030 6mm tee Connect to active port (4) on valve bank  +
  • Install 1 off cable tie base as shown Run cable X44 and X10 as shown Leave loops of excess cable tied off ready for electrical termination Leave cable X283 tied off in a loop on cylinder  +
  • It is vital that when installing pipes into the main X axis energy chain, that cable retaining points are used All cables and pipes should be secured with tie wraps to the 'fingers' on the energy chain brackets at BOTH ends  +
  • Material blower should be identified as 23Material blower should be identified as 2399 Located on roller assembly close to saw unit P0000160 flow reg required to control flow onto sensors, this should be pre fitted to roller assembly at bench assembly stage Connect to active port ln valve bank (4) Connect to active port ln valve bank (4)  +
  • Mount pre assembled pneumatic rail with 2 off M8 x 20 socket cps. Use 1 off M8 A Form washer on slotted end of rail  +
  • Use schematic for pneumatic connections Ensure P0000551 Q.E.V are fitted  +
  • Valve bank connections are as follows FrValve bank connections are as follows Front row of valve bank (4) is the active ports, These will all be connected with suffix 9 pipe identifications Back row (2) is the home position , these will always be connected with suffix 1 pipe identificationsnnected with suffix 1 pipe identifications  +