Rechercher dans les propriétés de la page

Rechercher dans les propriétés de la page

Entrer soit une page et une propriété, ou seulement une propriété, pour récupérer toutes les valeurs affectées.

Affichage de 9 résultats à partir du n°1.

Voir (20 précédentes | 20 suivantes) (20 | 50 | 100 | 250 | 500).


    

Liste de résultats

  • 1 Fit 4 off P0000200 Elbow Adaptor 6mm to 2 off P0001127 Guide cylinder 20 x 30 as shown 2 Use M4 x 50 socket caps to assemble D0015178 Z Block and D0015415 Turret Pickup Arm ZX5 on cylinder as shown . Assemble one of each hand as shown <br/>  +
  • 1 Mount bracket to bearing block as shown 1 Mount bracket to bearing block as shown using M6 x 16 socket caps and M6 x 20 socket caps both with A form washers on eject side 2 Mount bracket to bearing block combining blower block using M6 x 40 socket caps on saw infeed side 2 Ensure free movement is possible when z block slides through roller housing , check for clearance at indicated point 3 Attach table blower to infeed side cylinder assembly.. Fasteners and details required assembly.. Fasteners and details required  +
  • 2 off (1 per side) Please ensure that wh2 off (1 per side) Please ensure that when Z support assemblies are fitted in the next step, that movement of cylinder stroke is checked . Quality instances have arisen where Z block assemblies have been stiff to move on certain areas of travel. Use adjustment in mounting points of cylinder to ensure that full stoke of cylinder is smooth and consistent, and no resistance is observed when moving by handresistance is observed when moving by hand  +
  • All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added  +
  • Assemble turret units as shown 1 P0001157Assemble turret units as shown 1 P0001157 Turret Stop: 6 Station Right Handed Somatec x 1 P0001158 Turret Stop: 6 Station Left Handed Somatec x 1 Use M6 x 25 set bolts and M6 nuts Once stop positions have been identified set stop bolts to the following (measurement taken from face of turret stop to underside of hex head) Pos 1 20mm Pos 2 19mm Pos 3 18mm Pos 4 17mm Pos 5 17mm Pos6 17mm
    17mm Pos 5 17mm Pos6 17mm <br/>  +
  • Ensure configuration shown in these pictures are replicated on assembly Pay close attention to sensor position in relation to number markers  +
  • Ensure configuration shown in these pictures are replicated on assembly Pay close attention to sensor position in relation to number markers  +
  • Fit Sy datum block as shown , Fix with M6 40 socket cap 2 off check that block is set to run parallel with datum sensor  +
  • Turret assemblies must not be fitted to assembly once assembled. This is due to access to dowelling points on setup later. Bench assemble and leave for fitting at a later point  +