  • Fit 2 off hard stops to lower vertical shaft bearing blocks. Use 2 off M6 x 30 socket caps to fix  +
  • Fit 4 off bearing blocks from assembly R00Fit 4 off bearing blocks from assembly R0015296 Bench Assemble bearings Assemblies Orientate as shown .
    ...Ensure seals are not damaged when fitting to shafts

    ns-text">...Ensure seals are not damaged when fitting to shafts</div> </div><br/>  +
  • Individually remove each M8 socket cap (16 off) that secure the tie bars , apply adhesive and apply final tension  +
  • Lift fitted tie bars up and insert 1 off per bar support jig as shown . Secure with 2 off large tie wrap per jig  +
  • Slide 2 off H0006025 Shaft 40mm: 939mm Flowline Y-axis into the position shown. Ensure dimple position on shaft is marked clearly on end shaft as shon  +
  • Slide Y axis shafts into final position Slide Y axis shafts into final position 1 Align dimples using shaft end mark . Top shaft is at 45 degrees Bottom shaft is at 180 degrees
    ...To check grubscrew is located correctly into dimple, wind grubscrew into dimple, wind back 1/2 turn and try and rotate shaft by hand . Minimal rotation should be possible confirming the dimple has been aligned
    See image for grubscrew sizes
    irming the dimple has been aligned</div> </div> See image for grubscrew sizes  +
  • Subframe now requires dowelling in positioSubframe now requires dowelling in position 1 Drill upper beam mount with 10mm HSS 2 off , hole depth should be 20mm minimum into steel mounting tab . Use 10mm x 60mm spiral pin to fix 2 Dowel lower beam mounts . 4 off Drill indicated holes to 9.5 mm , then use 10mm hand reamer to finish . Fix with 10mm x 50 mm hardened dowelsh . Fix with 10mm x 50 mm hardened dowel  +
  • Use loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised  +
  • use D0006484 Front Tiebeam x 1 D000648use D0006484 Front Tiebeam x 1 D0006485 Rear Tiebeam x 1 1 Fit 4 off 8mm x 24 mm hardened dowels to each tie bar as shown 2 Align D0006485 Rear Tie beam with bearing blocks and use 8 off M8 x 50 socket caps to fix. Use fasteners to evenly pull faces together , alternate between top and bottom fasteners to pull faces together parallel
    ...Do not apply final tension to these bolts , only pull the two faces together
    3 Align D0006484 Rear Tie beam with bearing blocks and use 8 off M8 x 50 socket caps to fix. Use fasteners to evenly pull faces together , alternate between top and bottom fasteners to pull faces together parallel
    ......Do not apply final tension to these bolts , only pull the two faces together
    ss="icon-instructions-text">......Do not apply final tension to these bolts , only pull the two faces together</div> </div>  +