Rechercher dans les propriétés de la page

Rechercher dans les propriétés de la page

Entrer soit une page et une propriété, ou seulement une propriété, pour récupérer toutes les valeurs affectées.

Affichage de 17 résultats à partir du n°1.

Voir (20 précédentes | 20 suivantes) (20 | 50 | 100 | 250 | 500).


    

Liste de résultats

  • 3951 Connect to port 2 on valve bank the3951 Connect to port 2 on valve bank then route through trunking and exit as shown 3959 Connect to port 4 on valve bank then route through trunking and exit as shown 3952 Route between points shown 3953 Route between points shown Ensure 3 meters of pipe are left for connection once pipes exit trunking Leave coiled ready for later connection Leave coiled ready for later connection  +
  • Add 12mm Y fitting as shown, and connect additional 12mm pipe and exit as shown to provide valve bank air supply Use P0001107 12mm  +
  • Bring both 12mm blue pipes to point shown and use 12mm Tee connector to join. Run 12mm blue feed pipe to front exit of machine ( same exit as 6mm black pipes from valve bank)  +
  • Connect pipe 3891 to port 2 of valve bank Connect pipe 3891 to port 2 of valve bank and route as shown . Leave 1 meter tail exiting trunking Connect pipe 3899 to port 4 of valve bank and route as shown . Leave 1 meter tail exiting trunking Handing. Pipe exit will always be the trunking closet to the support cylinder with air adjustment fittingsport cylinder with air adjustment fittings  +
  • Connect previous 12mm Y connector to new 1Connect previous 12mm Y connector to new 12mm Y connector at point A or B (please note this position will change depending on handing . Position will be determined by the location of the exit point for step 9 , Y389) Use 12mm to 8mm reducer and connect 8mm blue air pipe , feed out of grommit along with previous fitted 2 off pipes 3891 and 3899 Use P0001107 12mm y connector P0001106 12-8mm reducer12mm y connector P0001106 12-8mm reducer  +
  • Connection for 12mm ring main as follows Connection for 12mm ring main as follows Retrieve 6mm blue pipe from point B, and route down trunking to point A At point A, connect 6mm blue pipe to fittings as shown Use P0001107 12mm Y x 1 P0000161 8-6mm reducer x 1 P0001106 12-8mm reducer x 1 Route 2 off 12 mm blue pipes from fittings as shown to points C and Ds from fittings as shown to points C and D  +
  • Exit point of shown pipes changes in respect to hand of machine Photo shows L-R configuration For R-L configuration, the pipes must exit the trunking on the left side ( opposite to shown picture)  +
  • Identify 6mm blue line from rotary head energy chain . Add P0000513 Q valve as shown Add P0000401 non return valve as shown Add P0000046 as shown Add additional 6mm blue pipe as shown and end 4 sections into energy chain  +
  • Pipe 3861 From port 2 of valvebank direPipe 3861 From port 2 of valvebank directly up to clamp area shown
    3862 routes from clamp area to point shown out of trunking 3863 routes from clamp area to point shown out of trunking 3869 connects from port 4 on valve bank and routes to trunking exit point as shown
    bank and routes to trunking exit point as shown  +
  • Pipe ID 3511 Connect to port 2 on valve Pipe ID 3511 Connect to port 2 on valve bank Through trunking and exit at point shown Pipe ID 3519 Connect to port 4 on valvebank Through trunking and exit as shown Pipe ID 3512 Through trunking and exit as shown leave pipes coiled up ready for later connectionpipes coiled up ready for later connection  +
  • Pipe Id 3609 Connect to port 4 on valvebank Blank port 2 Route through trunking and exit as shown. Leave 1.5meters of pipe from trunking exit Handing, pipe will always exit trunking at side shown opposite to side clamp connections  +
  • Pipe id 2699 Pipe trailing from rotary head energy chain Route into trunking and exit as shown to valve bank Blank port 2  +
  • Pipe id 2701 Connect to port 2 on valve Pipe id 2701 Connect to port 2 on valve bank Through trunking as shown Connect to Nose of clamp hold cylinder Pipe id 2709 Connect to port 4 on valve bank Through trunking as shown Leave 2 meter tails on both pipes exiting the trunking Handing. Pipes always exit trunking as shown next to side clamp assemblynking as shown next to side clamp assembly  +
  • Pipe id 3501 Connect to port 2 on valvebank Through trunking and exit at point shown Pipe id 3509 Connect to port 4 of valvebank Through trunking and exit at point shown Pipe ID 3502 Run pipe between points shown <br/>  +
  • Rear pipe exits change depending on handinRear pipe exits change depending on handing of machine As viewed from rear R-L pipes exit on the left L-R pipes exit on the right (shown in picture)
    ...Pipes always exit opposite side to cables at rear of machine
    Add 12mm y connector to split current 12mm blue pipe to provide supply pipe to exit rear of machine Use P0001107 12mm Y connector
    2mm blue pipe to provide supply pipe to exit rear of machine Use P0001107 12mm Y connector  +
  • Use 3 off m6 x 12 Socket caps +and 3 off M6 A form washers to fix Note the position shown is correct for L-R and R-L machines  +
  • Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised  +