  • # X axis of module is levelled from the t # X axis of module is levelled from the two indicated points . Use a 2 meter straight edge between these points and an engineers level on top # y axis is levelled from these two indicated points . an engineers level rested on this face is sufficient for levelling ed on this face is sufficient for levelling   +
  • 1 Adjust height of saw outfeed table to a1 Adjust height of saw outfeed table to align faces shown 2 Check that eject table cylinder can freely move beneath frame on full range of travel 3 Align front faces of saw and outfeed frame to be inline Check that Blue push bar is behind Saw rear fence rollers by at least 5mm( Adjustment is possible if not via slots on push bar assemblies )
    via slots on push bar assemblies ) <br/>  +
  • 1 Fix frames together with M10 x 100 set bolts, 3 off Large M10 washers stacked on each bolt and a M10 nut on each bolt. Use copper slip as shown 2 Connect 8mm Blue airpipe from saw module F to valve bank on outfeed (photo required)  +
  • 1 Pencil mark around 7 off arms 2 Remove tray and mark hole position as shown on each mark point on tray 3 Pilot and open to 7.5mm at each marked position  +
  • 1 Reposition tray with red trolley 2 Fit tray with 7 off M6 socket caps and heavy M6 washers  +
  • Approximately position saw out feed table Approximately position saw out feed table against saw module Leave a 10mm gap between frames until levelling has been completed Use black floor pads 4 off under adjustment bolts, ensuring copper slip is used on bolts (please note image shows safety tray fitted, this is an error and will not be fitted until later steps )and will not be fitted until later steps )  +
  • Connect swarf conveyor blower feed to saw module bulk head  +
  • Fit waste conveyor to out feed frame using 2 off M8 socket caps Adjust waste conveyor feet to minimise gap shown between saw module rear panel and waste guide on conveyor  +
  • Use red pump trolley to lift tray into position Set end indicated flush Ensure tray is pushed up against both saw and outfeed frame  +
  • Vital check required on fixing points for Vital check required on fixing points for saw conveyor mounting 2 off M8 rivnuts must be installed correctly 1 Face of frame must be countersunk to allow flush fitment and full contact of rivnut shoulder. 2 Rivnuts must be tensioned correctly when installed. If in doubt, please request information from supervisor for the correct fitting of rivnuts. 3 Rivnuts should have a solid fixed into frame and not be able to rotate . To check this, bolt a component to the rivnut and tighten. Then undo fastener and remove component. Rivnut should not move during this process and remain solid move during this process and remain solid  +