Rechercher dans les propriétés de la page

Rechercher dans les propriétés de la page

Entrer soit une page et une propriété, ou seulement une propriété, pour récupérer toutes les valeurs affectées.

Affichage de 8 résultats à partir du n°1.

Voir (20 précédentes | 20 suivantes) (20 | 50 | 100 | 250 | 500).


    

Liste de résultats

  • * 2 off 12mm red pneumatic pipes from transfer table to connect to saw service unit * 1 off 12mm diameter blue trailing from saw infeed module E to connect to saw service unit   +
  • 8mm Blue diameter trailing from Saw module requires connecting to valve bank attached to outfeed frame  +
  • All control pneumatic connections will be All control pneumatic connections will be identified with identification numbers All permanently fed supply lines will be identified by the use of Red pneumatic pipe All Emergency stop switched air feeds will be identified by the use of Blue pneumatic pipeentified by the use of Blue pneumatic pipe  +
  • Connect waste conveyor 6mm black pipe identified as 2139 to be connected to saw module bulkhead connection  +
  • Connections from rear of Module B <brConnections from rear of Module B
    * 2 off 12mm diameter Red pneumatic pipes trailing from transfer table wire basket to connect to 12mm bulkhead connections on rear of machining centre. These will be identified as 12mm Red on machining centre * 1 off 12mm diameter blue pneumatic pipe trailing from module C wire basket to be connected to bulkhead fitting on machining centre. This connection is next to the 2 off red connections and will be identified as 12mm Blue
    connections and will be identified as 12mm Blue  +
  • Machining centre to Machining centre InfeeMachining centre to Machining centre Infeed connections 12mm diameter blue pneumatic pipe from Infeed table to connect to Machining centre main Air service unit . Runs along cable basket on infeed table and drops out of end to connect to air service unit Mains air connection to machine via PCL connector . Do not connect until all subsequent pneumatic connections are completesequent pneumatic connections are complete  +
  • Once all pneumatic circuits are connected, all areas should be inspected for audible air leaks, and rectified as discovered  +
  • Transfer cylinder rails will be identified as follows 2299 2309 2319 2329 2339 2349 Connect each loom from cylinder rail to Tee connections directly beneath  +