  • 1 Route 6mm tubing through Y axis energy1 Route 6mm tubing through Y axis energy chain as shown 2 Fit 6mm y connector, and route additional 6mm tubing from Y connector as shown ( This y connector is fitted to stop pipe crimping on energy chain full movement 3 Tie new 6mm tubing to original loom exiting energy chain up to Tool break sensor assemblyrgy chain up to Tool break sensor assembly  +
  • 1 Connect 5 meter length of 6mm tubing to port shown on pilot valve and route into trunking at the same point as previous fitted tubing 2 Route pipe to point shown 3 Continue routing to trunking exit point  +
  • 1 Position valve bracket approximately as shown 2 Mark holes through bracket, Drill and tap through marked holes to M5  +
  • 1 Remove fitted P0000159 6mm blank from indicated port on main valve bank and connect 6mm black tubing , route through trunking and exit next to pilot valve 2 Connect to port shown on pilot valve  +
  • 1 Use 8mm Y connector to feed 8mm blue tub1 Use 8mm Y connector to feed 8mm blue tubing from original 8mm blue pipe feeding V notch cut valve 2 Connect to shown port on valve 3 Fit valve with mounting bracket to underside on angle plate, using 2 off M5 x 12 socket caps and 2 off A form washers to fixocket caps and 2 off A form washers to fix  +
  • Assemble Valve and Y connector as shown  +
  • Connect top tubing section as shown, ensuring Flow restrictor is added to the line and correctly orientated to allow flow regulation when adjusted (this can be tested once functioning ) Secure new tubing to original loom with tie wraps  +
  • Drill 7mm hole in D0001962 to dimensions shown. These are approximate dimensions for ease of fitting -+ 5mm  +
  • Insert copper pipe into drilled hole and hold in place with 6mm elbow tube tube fitting  +
  • Manipulate 6mm copper pipe as shown , approximately form and finalise on fitting  +
  • Map to FB02B 1622.0  +
  • OuB_BlwSpin,285,2,0,0,False,False,0,7,0,False,0,Y285  +
  • Refit all trunking lids and swarf chutes , and internal connections are now complete  +
  • Secure copper blower line to original tool break sensor blower as shown. Use Tie wraps to secure Position end as shown , until function testing in operation, where blower end should be positioned for optimum swarf clearance when routing  +
  • lower trunking lids and lower chute panel may require removing to install following pipework.  +