  • 1 Lightly Fix base of cylinder using 2 off1 Lightly Fix base of cylinder using 2 off M6 x 20 socket caps 2 Lightly fix bracket on cylinder using 2 off M x 30 socket caps 3 Ensure assembly is in contracted position (Plate dropped under own weight) 4 Finalise tension on fasteners securing cylinder position 5 Move assembly up and down by hand to check correct operation. Movement should be smooth and consistent. Movement should be smooth and consistent  +
  • 1 Support upstroke plate in extended posit1 Support upstroke plate in extended position 2 Fit guard using 2 off M5 16 countersunk hex bolts 3 Adjust damper bracket position to centralise guard on saw blade
    ...If enough movement is not possible, it will be required to machine adjustment slots to gain extra movement. See supervisor
    4 Remove guard , individual remove and add adhesive to fasters and apply final tension 5 Refit guard and check correct position of guard in relationship to saw blade
    tension 5 Refit guard and check correct position of guard in relationship to saw blade  +
  • 1 Tap all holes to remove debris from coat1 Tap all holes to remove debris from coating process 2 Dress faces with file and emery tape as shown
    ...Posts are a precision made part and great care must be taken when dressing faces to remove debris. Always dress from multiple angles to reduce the risk of losing flatness on the faces
    3 Clean faces and tapped holes with compressed air and Fe10 solvent
    /div> </div> 3 Clean faces and tapped holes with compressed air and Fe10 solvent  +
  • <u>'''Pictures required of these ste'''Pictures required of these steps''' for creating these pins 1 Use 2 off M6 x 100 socket caps to modify for damper pins Calculate length and cut bolts to suit , so only shank of bolt is used 2 Calculate FLAT position , and add flat to shank 3 Position lower Damper mount point and add lower pin ,ensuring to align flat on pin with grubscrew and secure with M6 x 10 kcp grubscrew 4 Position upper damper mount point and add pin, ensuring flat on pin aligns with grubscrew and fix with M6 x 10 kcp grubscrew
    grubscrew and fix with M6 x 10 kcp grubscrew <br/>  +
  • All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added  +
  • Do not add adhesive to bolts , But add finDo not add adhesive to bolts , But add final tension 1 Post positions are as shown 2 Fix posts on pre fitted 2 off socket caps. Then add 2 off M8 x 40 socket caps and A form washers per post . Ensure posts are aligned flush on faces indicated
    ...Ensure no debris is beneath the pillars when fitting to base. Any debris will dramatically effect setup later on

    tting to base. Any debris will dramatically effect setup later on</div> </div><br/>  +
  • Fit Damper bracket to top of shafts using 2 off M8 x 20 socket caps. Do not apply adhesive and only add light tension to these bolts  +
  • Remove guard and blade and store for later fitting Removing support jig lifting upstroke plate  +