  • Adjust Squareness by moving Module E in the direction shown Frame will need to move half the distance of the discrepancy measured on corner measurements  +
  • Attach jigs to Module C at indicated points  +
  • Check squareness by taking corner measurements where indicated  +
  • Check that beams are Parallel by measuring with a tape measure Report any discrepancy to supervisor  +
  • Fit transfer beam 1 (with pneumatic rail )Fit transfer beam 1 (with pneumatic rail ) and transfer beam 9 (no pneumatic rail ) to modules Fasten with button heads Fasten with M8 x 20 set bolts Do not use adhesive on these bolts as need to be removed for decommission Check that transfer beams sit flat along indicated faceseck that transfer beams sit flat along indicated faces  +
  • Install transfer beam 2 and secure Fasten with M8 x 20 set bolts Do not use adhesive on these bolts as need to be removed for decommission  +
  • Install transfer beam 3 and secure Fasten with M8 x 20 set bolts Do not use adhesive on these bolts as need to be removed for decommission  +
  • Install transfer beam 4 and secure Fasten with M8 x 20 set bolts Do not use adhesive on these bolts as need to be removed for decommission  +
  • Install transfer beam 5 and secure Fasten with M8 x 20 set bolts Do not use adhesive on these bolts as need to be removed for decommission  +
  • Install transfer beam 6 and secure Fasten with M8 x 20 set bolts Do not use adhesive on these bolts as need to be removed for decommission  +
  • Install transfer beam 7 and secure Fasten with M8 x 20 set bolts Do not use adhesive on these bolts as need to be removed for decommission  +
  • Install transfer beam 8 and secure Fasten with M8 x 20 set bolts Do not use adhesive on these bolts as need to be removed for decommission  +
  • It is important that the squareness and paIt is important that the squareness and parallel are checked after the levelling of the 2 frames in relation to each other. If there is a large variance in height between the 2 modules, a discrepancy will be created when measuring for correct positioning The amount of frame movement required after levelling has been performed will be minimal , and have negligible effect on levels set, and have negligible effect on levels set  +
  • Module E will require accurately positioning to align with Module C Only frame E must be moved  +
  • Module E will require re levelling now it has been moved Level from carriage plate for X axis and support arms for Y axis  +
  • Move module E in the directions shown to align to jigs Fasten jigs to module E once aligned  +
  • Once adjustment is complete, check measurements and levels of all areas adjusted  +
  • Once all transfer beams are installed, check flatness with a 2 meter straight edge Span across arms with 2 meter straight edge and check that no arms are sitting higher or lower than other transfer arms Sign off required by supervisor  +
  • Remove setting Jigs from modules  +
  • Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised  +