Rechercher dans les propriétés de la page

Rechercher dans les propriétés de la page

Entrer soit une page et une propriété, ou seulement une propriété, pour récupérer toutes les valeurs affectées.

Affichage de 16 résultats à partir du n°1.

Voir (20 précédentes | 20 suivantes) (20 | 50 | 100 | 250 | 500).


    

Liste de résultats

  • 1 It is vital that the air service unit o1 It is vital that the air service unit override switch and air pressure sensor are accessible from the front of the unit. To correct the position, the unit can easily be rebuilt. 2 Remove top plug by unscrewing cap and pulling plug off. Remove 2 off screws indicated and rotate over ride 180 degrees and refix with screws. Replace Cap and plug 3 Remove 2 off M5 socket caps and dismantle. Rotate pressure switch 180 degrees and reassemble. Ensure O rings shown are correctly seated when rebuildingshown are correctly seated when rebuilding  +
  • Assemble and mount 0-2 bar regulator to lower front panel  +
  • Assemble valve bank 1 Prepare parts 2 Fit gasket to valves . Ensure gasket sits flat and aligned 3 Fit valves to valve bank base 4 Attach Air feed connection and exhausts 5 Add 6mm blanks  +
  • Attach valve bank to regulator bracket using 4 off M4 x 40 socket caps , M4 washers and M4 nyloc nuts  +
  • Ecr raised to amend regulator bracket to remove redundant holes and add fixing holes for valve bank Use part as is until process to update is complete Drill regulator bracket M4 to suit valve base  +
  • Ensure in and out ports at 90 degrees to each other are used as shown 1 Assemble 7 off regulators with 6mm elbows and spare port blanked 2 Assemble 1 off regulator with 8mm elbows and spare port blanked  +
  • Fit 3 off 12mm bulkheads to rear lower panel  +
  • Fit 8mm bulkhead to lower front panel Fit air gun assembly Connect 8mm red pipe from reg OUT to bulkhead  +
  • Fit cable gland for air service unit  +
  • Mount 3 off 12mm bulkheads to lower panel  +
  • Mount air service unit to front lower panel  +
  • Mount regulators to front lower panel As viewed from front, bottom right regulator should have 8mm fittings  +
  • Print and Attach labels for regulator's Print and Attach labels for regulator's Labels to be added both sides of panel From top left to bottom right Y350 Clamp Infeed Top Y351 Clamp Infeed Side Y386 Clamp Middle Top Y386 Clamp middle Side Y395 Clamp V Top Y395 clamp V Side Z Axis Support VZ Axis SupportV Side Z Axis Support VZ Axis Support  +
  • Print and fit Labels to identify bulkheads as 12mm red 2 off 12mm blue 1 off  +
  • Reference for assembly of handed variants R-L and L-R shown for correct assembly of following steps <br/>  +
  • Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised  +