Rechercher dans les propriétés de la page

Rechercher dans les propriétés de la page

Entrer soit une page et une propriété, ou seulement une propriété, pour récupérer toutes les valeurs affectées.

Affichage de 18 résultats à partir du n°1.

Voir (20 précédentes | 20 suivantes) (20 | 50 | 100 | 250 | 500).


    

Liste de résultats

  • 1 3 off mounted sections now require drilling for spirol pins 2 Drill hole 7mm , then increase to 8mm and then fit 8mm x 24mm spirol pin 3 Repeat this on all dowel positions on all 3 mounted sections  +
  • 1 Mount D0015038B in position shown . U1 Mount D0015038B in position shown . Use M12 x 25 set bolts and M12 A form washers. Do not add loctite 243 at this stage. Ensure Section is mounted mid slot as shown 2 Use a 2 meter straight edge and position on top of mounted section as shown Use 300mm engineers level and adjust indicated point to bring section level 3 Tension fasteners to hold support section position
    rs to hold support section position <br/>  +
  • 1 Mount 1st Arm as shown , using pedestal1 Mount 1st Arm as shown , using pedestal stand and jack to support arm Fix with M10 x 30 socket caps and A form washers. 2 Use engineers level to adjust arm level at the indicated point 3 Use 1 meter straight edge and engineers level and adjust to level using jack
    ...only use the indicated face to level from. Due to manufacturing tolerances, any other faces will give a discrepancy to the top face which is the datum

    r faces will give a discrepancy to the top face which is the datum</div> </div><br/>  +
  • 1 Mount remaining 8 arms using to the sam1 Mount remaining 8 arms using to the same procedure . 2 To determine bottom bracket drilling position, measure between each arm when fitting to calculate the pitch, and set bottom support bracket to position to replicate the top . Picture shows points to measure the top . Picture shows points to measure  +
  • 1 Check levels as shown and adjust if required as this may have moved slightly when adjusting arm position 2 If any level adjustments are done, recheck wire line for straightness <br/>  +
  • 1 Drill first stage dowels above and below1 Drill first stage dowels above and below at points indicated to stop movement when finalising fasteners. Drill 7mm, Then increase to 8mm and then add 8mm x 24mm spirol pin . Repeat these steps at all indicated dowel points.
    ...Do not drill all dowel holes first then add all spirol pins at the end. Movement may occur and settings will be lost. Drill hole , add spirol pin and repeat

    ettings will be lost. Drill hole , add spirol pin and repeat</div> </div><br/>  +
  • 1 Mount D0015257 at position shown using 1 Mount D0015257 at position shown using same fixings as previous 2 By extending 2 meter straight edge slightly from previous fitted section, set height at point shown to be flush with 1st section 3 Move straight edge to sit only on 2nd section and move indicated point to adjust level 4 Tension fasteners to hold support section positionfasteners to hold support section position  +
  • 1 Mount D0015035B as shown using M10 x 20 1 Mount D0015035B as shown using M10 x 20 set bolts and A form washers 2 Mount D0015036B as shown M10 x 20 set bolts and A form washers 3 Mount D0015037B as shown M10 x 20 set bolts and A form washers 4 Ensure when mounted, Middle slot position is obtained 5 Do not use Loctite 243 at this pointed 5 Do not use Loctite 243 at this point  +
  • 1 Mount D0015039B at position shown using 1 Mount D0015039B at position shown using same fixings as previous step 2 By extending 2 meter straight edge slightly from previous fitted section, set height at point shown to be flush with 1st section 3 Move straight edge to sit only on 2nd section and move indicated point to adjust level 4 Tension fasteners to hold support section positionasteners to hold support section position  +
  • 1 Mount support arm to loader arm using M81 Mount support arm to loader arm using M8 x 30 socket cap , heavy M8 washers and M8 nyloc nut 2 Position Bottom of support bracket to dimension shown, and mark hole onto box section 3 Drill and tap hole to M6 and secure bracket with M6 x 20 socket cap and heavy M6 washer 4 Tighten 2 off M8 socket caps and nylocs on support bracket and remove jack and pedestal
    racket and remove jack and pedestal <br/>  +
  • 1 Remove M12 x 25 set bolt 2 Add Loctite 243 to thread 3 Refit and add final tension 4 Mark bolt as complete 5 Repeat for all M12 fasteners  +
  • 1 Set a wire line along front face of all 1 Set a wire line along front face of all arms Use dokit '''[https://stuga.dokit.app/wiki/Alignment_guide_using_wire_line ALIGNMENT USING WIRE LINE]''' to ensure correct use 2 Leave arms 1 and 9 as datum positions. Do not adjust these Move arms 2 to 8 in or out to achieve alignment on wire line
    ...Use a G clamp or lever bar to give controlled movement when adjusting arm position
    3 Ensure mounting channel joining points are also aligned to each other 4 Apply light tension to fasteners next to arms on support channel
    lso aligned to each other 4 Apply light tension to fasteners next to arms on support channel <br/>  +
  • If the frame has been leveled accurately, If the frame has been leveled accurately, the last section mounted should still be approximately mid slot when leveled If there is not enough adjustment '''available in the slot''' at this point to level section, it indicates an error on frame leveling. Supervisor check required at this point to confirm adjustmentsuired at this point to confirm adjustments  +
  • Prepare D0015035B,D0015036B and D0015037B ready for fitting. All tapped holes require cleaning to remove any debris from coating process  +
  • Remaining dowel points can now be drilled as above, and final spiral pins added  +
  • Remove M10 x 20 set bolts one at a time, add Loctite 243, refit, add final tension and mark . Repeat this for all M10 fasteners along aligned channels.  +
  • Sign off required by supervisor at this point before finalisation  +
  • Use loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised  +