Rechercher dans les propriétés de la page

Rechercher dans les propriétés de la page

Entrer soit une page et une propriété, ou seulement une propriété, pour récupérer toutes les valeurs affectées.

Affichage de 12 résultats à partir du n°1.

Voir (20 précédentes | 20 suivantes) (20 | 50 | 100 | 250 | 500).


    

Liste de résultats

  • 1 D0015006B indicated holes should meas1 D0015006B indicated holes should measure as shown. Rework by hand if issued old spec ECR raised 06/06/23 2 D0015002 rod end shaft . Check fit in P0000049 spherical bearing . Polish down diameter to allow shaft to pass through. ECR raised 06/06.23 to improve tolerance of shaft to allow better fitmenttolerance of shaft to allow better fitment  +
  • 1 off only and mark for later Reference 1 Tap 2 off indicated holes M3 2 Tap 2 off indicated holes M3  +
  • 13 off 1 Combine D0015481 shaft and B0001220 spacer as shown to mount cylinder to bracket. Use 26 off M6 x 12 socket caps and A form washers to fasten 2 Fit 2 off B0001103 bushes to D0015006B  +
  • 13 off 1 Fit 2 off D0015010 spacers, 1 off d0015002 shaft through spherical bearing and fix with 2 off m6 X 12 socket caps and A form washers 2 Fit 1 0ff D0015603 pivot shaft with 2 off M6 x 12 socket caps and A Form washers  +
  • 13 off Check part D00150001 has been supplied to new specification Check indicated hole, should measure 8.2mm. If not open up with hand drill Drawing change requested 06/06/23 to amend from 8mm to 8.2mm <br/>  +
  • 2 off Using same checks and setting as 2 off Using same checks and setting as above assemble 2 off roller tables with 3 rollers as shown, Use the pre built cylinder bracket with m3 tapped holes for 1 off, and add 2 off Sensor E001120 ,2 off Blower P0000200 and 2 off bracket D0015547 as shown . Connect P0000160 flow reg with a small section of 6mm black air pipe to each P0000200 elbow. Label as 2449
    ach P0000200 elbow. Label as 2449 <br/>  +
  • 5 off 7 Roller bed assemblies with two cylinders require pneumatic pipe installation. Use identification numbers as follows 1241 Home position 1249 Active position (down)  +
  • 5 off to be assembled 1 Mount 2 off D05 off to be assembled 1 Mount 2 off D0015005 to prebuild cylinder assemblies as shown Use M6 x 20 button socket head , A form washer and M6 nyloc nuts to fix. Do not use washer under head of button head screw, only use washers on nut side 2 Adjust the 2 off D0015005 1st section pushed against edge of clearance hole in direction shown 2nd section pushed in same direction 3rd Check parallel and adjust to correct 4th check squareness by taking corner measurements and adjusting if required Once all above is achieved, finalise fasteners all above is achieved, finalise fasteners  +
  • <div class="icon-instructions caution-i
    ......Ensure Fixing nut from indicated point is removed from each cylinder and disregarded
    13 off
    ...All Flow regulator fittings P0001198 should be set at this point to the correct flow rate. To do this follow these steps 1 Wind regulation screw clockwise until fully in. Do not overtighten, stop when light resistance is felt. 2 Turn regulation screw exactly 2.5 turns anticlockwise to set flow rate
    1 Fit 2 off P0001198 fittings to cylinder P0001110 2 Fit spherical bearing P0000049 to cylinder end , Do not add final tension to the nut
    Fit 2 off P0001198 fittings to cylinder P0001110 2 Fit spherical bearing P0000049 to cylinder end , Do not add final tension to the nut  +
  • Fit 7 off B0001092 roller to each assembly  +
  • Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised  +
  • Using same checks and setting as above assemble roller table with 4 rollers as shown  +