[version en cours de rédaction] | [version en cours de rédaction] |
(Une révision intermédiaire par le même utilisateur non affichée) | |||
Ligne 5 : | Ligne 5 : | ||
|Categories=Production | |Categories=Production | ||
|Difficulty=Hard | |Difficulty=Hard | ||
− | |Duration= | + | |Duration=5 |
|Duration-type=hour(s) | |Duration-type=hour(s) | ||
}} | }} | ||
Ligne 188 : | Ligne 188 : | ||
{{Tuto Step | {{Tuto Step | ||
|Step_Title=<translate>Fit channel bars</translate> | |Step_Title=<translate>Fit channel bars</translate> | ||
− | |Step_Content=<translate>Fit Black take up pads D0008288 and D0015742 using ?what? fasteners</translate> | + | |Step_Content=<translate>Fit Black take up pads D0008288 and D0015742 using '''?what?''' fasteners 01/10/23 |
+ | |||
+ | |||
+ | |||
+ | '''Please can somebody add what fasteners they use to mount these !!!!''' | ||
+ | |||
+ | 08/07/24 | ||
+ | |||
+ | |||
+ | How is the cylinder fitted to the channel bar ? | ||
+ | |||
+ | |||
+ | What fasteners ??? | ||
+ | |||
+ | |||
+ | i'm writing these for myself it seems .................................. | ||
+ | |||
+ | |||
+ | £5 to anyone that reads this | ||
+ | |||
+ | |||
+ | 08/07/24</translate> | ||
|Step_Picture_00=R0015279_Align_Backfences_Screenshot_2023-11-22_081950.png | |Step_Picture_00=R0015279_Align_Backfences_Screenshot_2023-11-22_081950.png | ||
}} | }} |
Procedure for correct alignment of module E back fences and channel bar
Auteur Gareth Green | Dernière modification 8/07/2024 par Gareth Green en cours de rédaction ⧼frevu-button-review-label⧽
Procedure for correct alignment of module E back fences and channel bar
R0015279_Align_Backfences_Screenshot_2023-07-14_140401.png
Tools Required
Standard hex key set
Standard spanner set
Wire Line setting equipment
600mm rule
Workshop Gripper setting jig
2 meter straight edge
Parts Required
Use Loctite 243 on all fasteners
Use Loctite 572 on all threaded pneumatic connection
Pen mark all fasteners to show finalised
It is vital that the backfences are square to the rollers on the roller table assemblies.
If backfences are not square, varying readings will be encountered when setting back fence alignment
To check
Make sure backfence is secured to roller bed assembly
Use gripper setting jig and place on blue rollers, and push up to back fence
Backfence should be touching jig at top and bottom point. If not, back fence can be manipulated by hand to ensure it sits in a square position in relation gto the setting jig.
This check MUST be done before backfence alignment
Set position 10 to measure taken in previous step from position 1
Tolerance -+ 0.5mm
Ensure all positions of backfences except 1 and 10 are not touching wire line
Individually adjust each backfence to be less than 0.5mm from wireline but not touching
The first 2 meter section of backfences from position 1 should now be fine tuned with a 2 meter straight edge
Position 2 meter straight edge against indicated points
Use steel rule to measure each backfence position from hepco rail
Measurement taken in step 3 should indicated at all backfences if set correctly .
Tolerance -+ 0.5mm
Backfence height needs to be checked in the roller lowered position.
To do this
1 Remove air from cylinders to allow rollers to drop
2 Use 2 meter straight edge to span between transfer arms
3 drag straight edge over backfences, straight edge should not touch backfence at any point
4 Check this on all roller beds on module E
Gripper position requires setting now that back fences are aligned
The following steps should be followed for correct alignment
Ensure setting jig is set against position 1 backfences
Ensure setting jig is orientated correctly , correct offset of holes towards backfence
Adjust gripper on mounting arms to align gripper teeth with setting jig
Ensure that when adjusting , gripper remains parallel to hepco beam . Check this by measuring the indicated points
Once gripper position is set at position 1, it should be checked at all backfences for consistency
Report any discrepancy to supervisor
Double check all fasteners used for adjustment have loctite 243, final tension applied and pen marked
Supervisor sign off required at this stage
Fit Black take up pads D0008288 and D0015742 using ?what? fasteners 01/10/23
Please can somebody add what fasteners they use to mount these !!!!
08/07/24
How is the cylinder fitted to the channel bar ?
What fasteners ???
i'm writing these for myself it seems ..................................
£5 to anyone that reads this
08/07/24
Channel bar positions now need to be set relative to new gripper position
Position gripper in front cylinder assembly for channel bar
Adjust base of cylinder so that there is a 3mm gap present between gripper and channel bar, when cylinder is fully extended
Move gripper to each swivel assembly and adjust base to ensure 3mm gap when cylinder is fully extended
Repeat setting process for all swivel arms ( 4 off in total )
Adjust bump stop so it makes correctly when cylinder is retracted
Channel bar should be checked at all swivel points for the correct height setting
Adjust height of assemblies to set indicated height to 3-4mm
Ensure all measurements are consistent at adjustable points
Fully extend channel cylinder
Move gripper along entire axis
3mm gap between channel bar and gripper should remain consistent at all points
Supervisor sign off required at this point
Check that all fasteners are correctly tensioned, have had Loctite 243 applied and are pen marked
en none 0 Draft
Vous avez entré un nom de page invalide, avec un ou plusieurs caractères suivants :
< > @ ~ : * € £ ` + = / \ | [ ] { } ; ? #