R0015279 Align Backfences : Différence entre versions

[version en cours de rédaction][version en cours de rédaction]
 
(3 révisions intermédiaires par le même utilisateur non affichées)
Ligne 5 : Ligne 5 :
 
|Categories=Production
 
|Categories=Production
 
|Difficulty=Hard
 
|Difficulty=Hard
|Duration=2
+
|Duration=5
 
|Duration-type=hour(s)
 
|Duration-type=hour(s)
 
}}
 
}}
Ligne 41 : Ligne 41 :
 
Pen mark all fasteners to show finalised</translate>
 
Pen mark all fasteners to show finalised</translate>
 
|Step_Picture_00=R0015086_Assemble_Pneumatics_on_to_electrical_cabinet_loctite_243.png
 
|Step_Picture_00=R0015086_Assemble_Pneumatics_on_to_electrical_cabinet_loctite_243.png
 +
}}
 +
{{Tuto Step
 +
|Step_Title=<translate>Quality check</translate>
 +
|Step_Content=<translate>It is vital that the backfences are square to the rollers on the roller table assemblies.
 +
 +
 +
If backfences are not square, varying readings will be encountered when setting back fence alignment
 +
 +
 +
To  check
 +
 +
 +
Make sure backfence is secured to roller bed assembly
 +
 +
 +
Use gripper setting jig and place on blue rollers, and push up to back fence
 +
 +
 +
Backfence should be touching jig at top and bottom point.  If not, back fence can be manipulated by hand to ensure it sits in a square position in relation gto the setting jig. 
 +
 +
 +
This check MUST be done before backfence alignment</translate>
 +
|Step_Picture_00=R0008013_Clacker_assembly_quality.png
 
}}
 
}}
 
{{Tuto Step
 
{{Tuto Step
Ligne 59 : Ligne 82 :
 
{{Tuto Step
 
{{Tuto Step
 
|Step_Title=<translate>Set position 10</translate>
 
|Step_Title=<translate>Set position 10</translate>
|Step_Content=<translate>Set position 10 to measure taken in previous step from position 1</translate>
+
|Step_Content=<translate>Set position 10 to measure taken in previous step from position 1
 +
 
 +
 
 +
Tolerance -+ 0.5mm</translate>
 
|Step_Picture_00=R0015279_Align_Backfences_Screenshot_2023-10-30_121700.png
 
|Step_Picture_00=R0015279_Align_Backfences_Screenshot_2023-10-30_121700.png
 
|Step_Picture_00_annotation={"version":"2.4.6","objects":[{"type":"image","version":"2.4.6","originX":"left","originY":"top","left":0,"top":0,"width":1663,"height":885,"fill":"rgb(0,0,0)","stroke":null,"strokeWidth":0,"strokeDashArray":null,"strokeLineCap":"butt","strokeDashOffset":0,"strokeLineJoin":"miter","strokeMiterLimit":4,"scaleX":0.36,"scaleY":0.36,"angle":0,"flipX":false,"flipY":false,"opacity":1,"shadow":null,"visible":true,"clipTo":null,"backgroundColor":"","fillRule":"nonzero","paintFirst":"fill","globalCompositeOperation":"source-over","transformMatrix":null,"skewX":0,"skewY":0,"crossOrigin":"","cropX":0,"cropY":0,"src":"https://stuga.dokit.app/images/2/2b/R0015279_Align_Backfences_Screenshot_2023-10-30_121700.png","filters":[]},{"type":"wfellipse","version":"2.4.6","originX":"center","originY":"center","left":464.25,"top":163.25,"width":55.01,"height":55.01,"fill":"rgba(255,0,0,0)","stroke":"#FF0000","strokeWidth":2,"strokeDashArray":null,"strokeLineCap":"butt","strokeDashOffset":0,"strokeLineJoin":"miter","strokeMiterLimit":4,"scaleX":1,"scaleY":1,"angle":0,"flipX":false,"flipY":false,"opacity":1,"shadow":null,"visible":true,"clipTo":null,"backgroundColor":"","fillRule":"nonzero","paintFirst":"fill","globalCompositeOperation":"source-over","transformMatrix":null,"skewX":0,"skewY":0,"rx":27.503842623844022,"ry":27.503842623844022},{"type":"textbox","version":"2.4.6","originX":"center","originY":"center","left":304.32,"top":264.44,"width":102.57,"height":22.6,"fill":"#FF0000","stroke":"#FF0000","strokeWidth":1,"strokeDashArray":null,"strokeLineCap":"butt","strokeDashOffset":0,"strokeLineJoin":"miter","strokeMiterLimit":4,"scaleX":2.83,"scaleY":2.83,"angle":0,"flipX":false,"flipY":false,"opacity":1,"shadow":null,"visible":true,"clipTo":null,"backgroundColor":"","fillRule":"nonzero","paintFirst":"fill","globalCompositeOperation":"source-over","transformMatrix":null,"skewX":0,"skewY":0,"text":"Position 10","fontSize":20,"fontWeight":"normal","fontFamily":"sans-serif","fontStyle":"normal","lineHeight":1.16,"underline":false,"overline":false,"linethrough":false,"textAlign":"left","textBackgroundColor":"","charSpacing":0,"minWidth":20,"styles":{} }],"height":319,"width":600}
 
|Step_Picture_00_annotation={"version":"2.4.6","objects":[{"type":"image","version":"2.4.6","originX":"left","originY":"top","left":0,"top":0,"width":1663,"height":885,"fill":"rgb(0,0,0)","stroke":null,"strokeWidth":0,"strokeDashArray":null,"strokeLineCap":"butt","strokeDashOffset":0,"strokeLineJoin":"miter","strokeMiterLimit":4,"scaleX":0.36,"scaleY":0.36,"angle":0,"flipX":false,"flipY":false,"opacity":1,"shadow":null,"visible":true,"clipTo":null,"backgroundColor":"","fillRule":"nonzero","paintFirst":"fill","globalCompositeOperation":"source-over","transformMatrix":null,"skewX":0,"skewY":0,"crossOrigin":"","cropX":0,"cropY":0,"src":"https://stuga.dokit.app/images/2/2b/R0015279_Align_Backfences_Screenshot_2023-10-30_121700.png","filters":[]},{"type":"wfellipse","version":"2.4.6","originX":"center","originY":"center","left":464.25,"top":163.25,"width":55.01,"height":55.01,"fill":"rgba(255,0,0,0)","stroke":"#FF0000","strokeWidth":2,"strokeDashArray":null,"strokeLineCap":"butt","strokeDashOffset":0,"strokeLineJoin":"miter","strokeMiterLimit":4,"scaleX":1,"scaleY":1,"angle":0,"flipX":false,"flipY":false,"opacity":1,"shadow":null,"visible":true,"clipTo":null,"backgroundColor":"","fillRule":"nonzero","paintFirst":"fill","globalCompositeOperation":"source-over","transformMatrix":null,"skewX":0,"skewY":0,"rx":27.503842623844022,"ry":27.503842623844022},{"type":"textbox","version":"2.4.6","originX":"center","originY":"center","left":304.32,"top":264.44,"width":102.57,"height":22.6,"fill":"#FF0000","stroke":"#FF0000","strokeWidth":1,"strokeDashArray":null,"strokeLineCap":"butt","strokeDashOffset":0,"strokeLineJoin":"miter","strokeMiterLimit":4,"scaleX":2.83,"scaleY":2.83,"angle":0,"flipX":false,"flipY":false,"opacity":1,"shadow":null,"visible":true,"clipTo":null,"backgroundColor":"","fillRule":"nonzero","paintFirst":"fill","globalCompositeOperation":"source-over","transformMatrix":null,"skewX":0,"skewY":0,"text":"Position 10","fontSize":20,"fontWeight":"normal","fontFamily":"sans-serif","fontStyle":"normal","lineHeight":1.16,"underline":false,"overline":false,"linethrough":false,"textAlign":"left","textBackgroundColor":"","charSpacing":0,"minWidth":20,"styles":{} }],"height":319,"width":600}
Ligne 77 : Ligne 103 :
 
{{Tuto Step
 
{{Tuto Step
 
|Step_Title=<translate>Adjust each backfence</translate>
 
|Step_Title=<translate>Adjust each backfence</translate>
|Step_Content=<translate>Individually adjust each backfence to be less than 1mm from wireline but not touching</translate>
+
|Step_Content=<translate>Individually adjust each backfence to be less than 0.5mm  from wireline but not touching</translate>
 
|Step_Picture_00=R0015279_Align_Backfences_Screenshot_2023-10-30_121700.png
 
|Step_Picture_00=R0015279_Align_Backfences_Screenshot_2023-10-30_121700.png
 
}}
 
}}
Ligne 95 : Ligne 121 :
 
Measurement taken in step 3 should indicated at all backfences if set correctly .
 
Measurement taken in step 3 should indicated at all backfences if set correctly .
  
<br /></translate>
+
<br />Tolerance -+ 0.5mm</translate>
 
|Step_Picture_00=R0000711_Rotary_Base_Assembly_quality-assurance-testing.png
 
|Step_Picture_00=R0000711_Rotary_Base_Assembly_quality-assurance-testing.png
 
}}
 
}}
Ligne 162 : Ligne 188 :
 
{{Tuto Step
 
{{Tuto Step
 
|Step_Title=<translate>Fit channel bars</translate>
 
|Step_Title=<translate>Fit channel bars</translate>
|Step_Content=<translate>Fit Black take up pads D0008288 and D0015742 using ?what? fasteners</translate>
+
|Step_Content=<translate>Fit Black take up pads D0008288 and D0015742 using '''?what?''' fasteners 01/10/23
 +
 
 +
 
 +
 
 +
'''Please can somebody add what fasteners they use to mount these !!!!'''
 +
 
 +
08/07/24
 +
 
 +
 
 +
How is the cylinder fitted to the channel bar ?
 +
 
 +
 
 +
What fasteners ???
 +
 
 +
 
 +
i'm writing these for  myself it seems ..................................
 +
 
 +
 
 +
£5 to anyone that reads this
 +
 
 +
 
 +
08/07/24</translate>
 
|Step_Picture_00=R0015279_Align_Backfences_Screenshot_2023-11-22_081950.png
 
|Step_Picture_00=R0015279_Align_Backfences_Screenshot_2023-11-22_081950.png
 
}}
 
}}

Version actuelle datée du 8 juillet 2024 à 13:12

Auteur avatarGareth Green | Dernière modification 8/07/2024 par Gareth Green en cours de rédaction

Introduction

Tools Required


Standard hex key set

Standard spanner set

Wire Line setting equipment

600mm rule

Workshop Gripper setting jig

2 meter straight edge


Parts Required


Fitted and Levelled roller bed assemblies

Étape 1 - Unless otherwise stated

Use Loctite 243 on all fasteners

Use Loctite 572 on all threaded pneumatic connection

Pen mark all fasteners to show finalised



Étape 2 - Quality check

It is vital that the backfences are square to the rollers on the roller table assemblies.


If backfences are not square, varying readings will be encountered when setting back fence alignment


To check


Make sure backfence is secured to roller bed assembly


Use gripper setting jig and place on blue rollers, and push up to back fence


Backfence should be touching jig at top and bottom point. If not, back fence can be manipulated by hand to ensure it sits in a square position in relation gto the setting jig.


This check MUST be done before backfence alignment



Étape 3 - Set position 1

Set backfence position 1 to have a gap of 3mm at the indicated point


Étape 4 - Measure Position 1

Take measurement at indicated point



Étape 5 - Set position 10

Set position 10 to measure taken in previous step from position 1


Tolerance -+ 0.5mm


Étape 6 - Add wire line to backfences

Fit wire line to backfences to span all



Étape 7 - Ensure only positions 1 and 10 are contacting

Ensure all positions of backfences except 1 and 10 are not touching wire line



Étape 8 - Adjust each backfence

Individually adjust each backfence to be less than 0.5mm from wireline but not touching



Étape 9 - Finalise alignment

The first 2 meter section of backfences from position 1 should now be fine tuned with a 2 meter straight edge


Position 2 meter straight edge against indicated points



Étape 10 - Quality /alignment check

Use steel rule to measure each backfence position from hepco rail


Measurement taken in step 3 should indicated at all backfences if set correctly .


Tolerance -+ 0.5mm



Étape 11 - Back fence height quality check

Backfence height needs to be checked in the roller lowered position.


To do this


1 Remove air from cylinders to allow rollers to drop


2 Use 2 meter straight edge to span between transfer arms


3 drag straight edge over backfences, straight edge should not touch backfence at any point


4 Check this on all roller beds on module E



Étape 12 - Gripper position setting

Gripper position requires setting now that back fences are aligned


The following steps should be followed for correct alignment



Étape 13 - Use setting jig

Ensure setting jig is set against position 1 backfences


Ensure setting jig is orientated correctly , correct offset of holes towards backfence



Étape 14 - Adjust gripper

Adjust gripper on mounting arms to align gripper teeth with setting jig


Ensure that when adjusting , gripper remains parallel to hepco beam . Check this by measuring the indicated points


Étape 15 - Check all positions

Once gripper position is set at position 1, it should be checked at all backfences for consistency


Report any discrepancy to supervisor



Étape 16 - Finalise all fasteners

Double check all fasteners used for adjustment have loctite 243, final tension applied and pen marked


Supervisor sign off required at this stage



Étape 17 - Fit channel bars

Fit Black take up pads D0008288 and D0015742 using ?what? fasteners 01/10/23


Please can somebody add what fasteners they use to mount these !!!!

08/07/24


How is the cylinder fitted to the channel bar ?


What fasteners ???


i'm writing these for myself it seems ..................................


£5 to anyone that reads this


08/07/24



Étape 18 - Set channel Bar position

Channel bar positions now need to be set relative to new gripper position



Étape 19 - Position gripper

Position gripper in front cylinder assembly for channel bar


Adjust base of cylinder so that there is a 3mm gap present between gripper and channel bar, when cylinder is fully extended


Étape 20 - Adjust each swivel assembly

Move gripper to each swivel assembly and adjust base to ensure 3mm gap when cylinder is fully extended


Repeat setting process for all swivel arms ( 4 off in total )



Étape 21 - Adjust bump stop

Adjust bump stop so it makes correctly when cylinder is retracted


...Ensure the bump stop strikes in the position shown on the connection block in the photo



Étape 22 - Set height of channel bar

Channel bar should be checked at all swivel points for the correct height setting


Adjust height of assemblies to set indicated height to 3-4mm


Ensure all measurements are consistent at adjustable points



Étape 23 - Check clearance

Fully extend channel cylinder


Move gripper along entire axis


3mm gap between channel bar and gripper should remain consistent at all points


Supervisor sign off required at this point



Étape 24 - Fastener check

Check that all fasteners are correctly tensioned, have had Loctite 243 applied and are pen marked



Commentaires

Draft